Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: <br />Gemini at Colfax Apts. — EXTERIOR RENOVATIONS`4 <br />^, <br />Project Number: <br />119-103 <br />For Bids Due: <br />February ", 2020 <br />Contractor Name: <br />Bokon Masonr Inc. <br />BASE BID —Division A <br />Item p Quantity Unit Unit Price T.. _— cunt <br />No. Description Total Amount <br />1 Division A: Roof remove and 1 LS <br />re lacement. <br />2 Division A: Deck repair 100 SF <br />BASE BID TOTAL <br />BASE BID — Division B <br />Item <br />No. <br />Description <br />p <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />Division B: Masonry Parapet Rebuild <br />_ <br />....... <br />1 <br />section 1 (see drawing page A2.4) — <br />rebuild parapet including finials & <br />1 <br />LS <br />$243,097.00 <br />pedestrian protections. <br />Division B: Masonry Wall Repair section <br />2 <br />2 (see drawing page A2.4) — repair <br />1 <br />LS <br />17 5 04 5 <br />indicated wall areas including at two <br />, .0 <br />removed fire stairs. <br />3 <br />Division B: replace additional 5 SF <br />'Chicago <br />1 <br />5 SF <br />.......... ._..... <br />Common' wall veneer brick <br />1151 .00 <br />BASE BID TOTAL $ 418 ,_142 .00 <br />BASE BID —Division C <br />Item <br />Description Quantity <br />Unit <br />No. <br />Unit Price Total Amount <br />1 Division C Base Bid: replace 2 fire stairs <br />1 <br />on west side of buildin . <br />LS <br />BASE BID TOTAL <br />BASE BID — Division D <br />Item Description <br />No. _—_ <br />Quantity <br />Unit Unit Price Total Amount <br />...�._._--- <br />Division D Base Bid: New water service <br />.. . <br />_ <br />1 from Washington St. to south building <br />1 <br />LS <br />foundation wall. Landsca a repair. <br />BASE BID TOTAL <br />(cont. next page) <br />Version 4/2/2019 Contractor's Bid for Public Works - 7 <br />