Laserfiche WebLink
Waste Management, and other pickup services as requested to ensure collection services <br />are maintained. The Contractor shall be required to collect bins, place them in a common <br />point for easy access by automated truck services, and redistribution after pickup as <br />requested. <br />2. The Contractor shall be responsible for snow removal within the project limits and shall <br />coordinate with City of South Bend Public Works. The Contractor is responsible for <br />protecting his/her/its project site from excessive wear and tear during snow removal. <br />XXIII. PLANS <br />A. Prevailing Specifications: City of South Bend Design and Construction Standards <br />B. Additions: <br />1. The plans consist of (6) Sheets. <br />2. The specifications consist of Divisions 1, 2, 4, 7, 8, 13, & 33 and are attached below. <br />3. The work shall conform to the plans and specifications. <br />4. The drawings are schematic in nature. <br />5. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />6. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall <br />govern. <br />Version 8/19/2019 Special Provisions - 10 <br />