My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/11/12 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2012
>
09/11/12 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2015 4:17:35 PM
Creation date
9/26/2012 8:54:03 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
9/11/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />SEPTEMBER 11 2012 292 <br />Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Employment Eligibility <br />Verification, Non - Discrimination Commitment for Contractors and Certification of Use <br />of United States Steel Products or Foundry Products was submitted <br />Ten percent (10 %) Bid Bond was submitted <br />li_# <br />Manufacturer Description Unit Price Est. Qty. Unit Price <br />Pierce Custom Pumper $486,600.00ea 2 <br />Option Description Cost Total <br />1 Stainless steel cab. NIA NIA <br />2 Stainless steel apparatus body. $10,800.00 $497,400.00 ea <br />3 Hendrickson heavy duty air suspension. $6,344.00 $492,944.00 ca <br />FERRAR.A FIRE APPARATUS <br />27855 James Chapel Road <br />Holden, Louisiana 70744 <br />Bid was signed by: Mr. Garry Hickman <br />Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Employment Eligibility <br />Verification, Non - Discrimination Commitment for Contractors and Certification of Use <br />of United States Steel Products or Foundry Products was submitted <br />Ten percent (10 %) Bid Bond was submitted <br />BID: <br />Manufacturer Description Unit Price Est. Qty. Unit Price <br />Ferrara Igniter Pumper $495,819.00 2 $991,638.00 <br />Option Description Cost Total <br />I Stainless steel cab. NIA N/A <br />2 Stainless steel apparatus body. $4,375.00 $8,750.00 <br />3 Hendrickson heavy duty air suspension. $2,846.00 $5,692.00 "I <br />Alternate Bid: <br />Manufacturer Description Unit Price I Est. Qty. Unit Price <br />Ferrara Ember Pumper $432,791.00 2 $865,582.00 <br />Option Description Cost Total <br />1 Stainless steel cab. N/A N/A <br />2 Stainless steel apparatus body. $4,375.00 $8,750.00 <br />3 Hendrickson heavy duty air suspension. NIA N/A <br />Upon a motion made by Mr. Gilot, seconded by Mr. Inks and carried, the above bids were <br />referred to Equipment Services and the Fire Department for review and recommendation. Ms. <br />Greene noted that the bids will take some time to review and the review committee will need to <br />confirm that all of the bids contain all of the required forms and meet the requirements of the bid <br />specifications. <br />APPROVE CHANGE ORDER NO 2 MAIN STREET WAYNE STREET AND LEIGHTON <br />PARKING GARAGE ACCESS CONTROLS — ELECTRICAL INSTALLATION PARKING <br />GARAGE CAPITAL <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 2 on behalf <br />of Koontz - Wagner Construction Services, LLC, 3801 Voorde Drive, South Bend, Indiana, <br />indicating the contract amount be increased by $3,400.00 for a modified contract sum, including <br />this Change Order, in the amount of $25,400.00. Upon a motion made by Mr. Inks, seconded by <br />Ms. Roos and carried, the Change Order was approved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.