REGULAR MEETING <br />SEPTEMBER 11, 2012 288 <br />(Per SF) <br />$114,578.00 <br />Base Bid Plus Alternates <br />Masonry Tuckpointing — West and North (Per SF) <br />$14.50 E($1 0} <br />Masonry Cleaning (Per SF) <br />$0.80 <br />Brick Replacement (Per SF) $24.00- <br />Alternates <br />1 <br />$101,653.00 <br />2 <br />$69,937.00 <br />3 <br />$5,177.00 <br />4 <br />$6,558.00 <br />TRISCO SYSTEMS, INC. <br />2000 Baty Road <br />Lima, Ohio 45807 <br />Bid was signed by: Mr. Steven Walter <br />Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Employment Eligibility <br />Verification, Non - Discrimination Commitment for Contractors and Certification of Use <br />of United States Steel Products or Foundry Products was submitted <br />Five percent (5 %) Bid Bond was submitted <br />on <br />Base Bid <br />$114,578.00 <br />Base Bid Plus Alternates <br />$248,893.00 <br />Unit Pricing <br />Masonry Tuckpointing — East /South/Partial West <br />$13 .00 ($11.00) <br />(Per SF) <br />Masonry Tuckpointing— West and North (Per SF) <br />$10.40 ($8.00) <br />Masonry Cleaning (Per SF) <br />$1.25 <br />Brick Replacement (Per SF) <br />$32.00 <br />Alternates <br />1 <br />$98,331.00 <br />2 <br />$21,975.00 <br />3 <br />$3,128.00 <br />4 <br />$10,881.00 <br />Upon a motion made by Mr. Gilot, seconded by Mr. Inks and carried, the above bids were <br />referred to South Bend Heritage and Community and Economic Development for review and <br />recommendation. After reviewing those bids, Mr. Gregory Kil, Kil Architecture, recommended <br />that the Board award the contract to the lowest responsive and responsible bidder Kemna <br />Restoration & Construction, Inc., in the amount of $103,900.00, which is the Base Bid. <br />Therefore, Mr. Inks made a motion that the recommendation be accepted and the bid be awarded <br />and the contract approved as outlined above. Ms. Roos seconded the motion, which carried. <br />OPENING AND AWARD OF BIDS — APPROVE CONTRACTS — RUSHTON <br />REHABILITATION PROJECT — WINDOW REHABILI <br />(WWCDA TIF} TATION — PROJECT NO. 112 -037B <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. The following bids were opened and publicly <br />read: <br />MORCON CONSTRUCTION CO. INC. <br />5905 Golden Valley Road <br />Golden Valley, Minnesota 55422 <br />Bid was signed by: Mr. Stanley Thom <br />Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Employment Eligibility <br />Verification, Non - Discrimination Commitment for Contractors and Certification of Use <br />of United States Steel Products or Foundry Products was submitted <br />Five percent (5 %) Bid Bond was submitted <br />1 <br />