My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 11-16-79
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1970-1979
>
1979
>
RM 11-16-79
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2012 4:45:00 PM
Creation date
9/25/2012 1:13:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Be <br />Regular <br />6. NEW <br />e. <br />M <br />nd <br />Redevelopment Commission <br />Meeting <br />- November 16, 1979 <br />BUSINESS <br />tinued... <br />co <br />Mr. <br />Harcus: With homeowners concurrence an attempt was <br />mace <br />to provide reasonable cabinet storage by utilizing <br />some <br />of the existing, units in the small kitchen at 946 <br />E. <br />Sorin Street,. It did not materialize.. The Commis - <br />si <br />ners are requested to approve the attached Change <br />Or <br />er No. b calling for the installation of additional <br />but <br />small units for a cost increase of $382,00, <br />Ms. <br />Auburn made a motion to approve Change Order #6, wi- <br />Pl <br />is Construction Company, for an increase in contract <br />price <br />of $382.00, at the address of 946 E. Sorin St., <br />seconded <br />by Mr. Robinson, and the motion was unanimousl; <br />carried. <br />Cor <br />ission a proval requested for Change Order #4, with <br />P1 <br />is Construction Com an , for an increase in contract <br />of 310.08, for an amended contract total of <br />F.ce <br />846.08, at the address of 1111 East Miner Street, <br />South <br />Bend, Indiana, as set forth in letter from Mr. <br />James <br />Harcus, Director, Bureau of Housing. <br />Harcus: When bathtub at 1111 E. Miner was being <br />Mr. <br />re <br />laced it was discovered that flooring had deterio- <br />rated <br />to the point that joists and subfloor had to be <br />re <br />laced. Because of the nature of the structural defe <br />an <br />emergency order to proceed was issued. The Commis- <br />si <br />ners are requested to approve the attached related <br />Change <br />Order No. 4 which increases cost by $310.08. <br />Mr <br />Robinson made a motion to approve Change Order #.4, <br />with <br />Plaia Construction Company, for an increase in <br />contract <br />price of $310.08, at the address of 1111 East <br />Miner <br />Street, seconded by Ms. Auburn, and the motion <br />was <br />unanimously carried. <br />Commission <br />approval requested for Change Order #5, with <br />R. <br />A. Stickler Plumbing, for an increase in contract <br />of 120.00, for an amended contract total of <br />F9ice <br />2.00, at the address of 1111 E. Miner Street, South <br />Be <br />d, Indiana, as set forth in letter from Mr. James <br />Harcus, <br />Director, Bureau of Housing. <br />Harcus: After servicing repair of deteriorated joi <br />Mr. <br />and <br />subfloor (Change Order #4) at 1111 E. Miner it was <br />discovered <br />that the original water closet was itself so <br />distorted <br />that it could not fit flush with new level fl <br />Because <br />of the nature of this problem an emergency noti <br />to <br />proceed was issued for a water closet replacement. <br />-14- <br />i <br />th <br />cts <br />sts <br />oor. <br />ce <br />CHANGE ORDER #4 <br />WITH PLAZA CON- <br />STRUCTION COMPANY <br />APPROVED <br />CHANGE ORDER #5 <br />WITH R.A. STICKLER <br />PLUMBING APPROVED <br />
The URL can be used to link to this page
Your browser does not support the video tag.