Laserfiche WebLink
294 <br />8_. 1902 • <br />Engineer reported drawings and specifications for the macadamizing of E• Bart- <br />lett street and the construction of cement curbing from the east line of Michigan street <br />to the east line of St • Joseph street • <br />IMPROVEMENT RESOLUTION NO.67- <br />Resolved by the Board of Public Works of the City of South Bend, Indiana: That <br />an improvement be made of the kind, size, location and terminal points as follows: The <br />.paving of East Bartlett street, from the east line of Miehigan toothec Last line of St <br />Joseph streets with crushed --stone -macadam and gravel; also the construction of cement <br />durbs� onsi both : g;ides':of said.--,; Bartlett . street within said terminal points- Said improve- <br />: ment shall- be -known and designated as"Bartlett Street Macadam" and shall be constricted <br />according to the plans and specifications prepared by the City Civil Engineer, filed here- <br />with- Notice of this resolution and proposals for bids for the exercution of the above <br />work shall be published on the 9 day of May and on the 16 day of May 1902, in the South <br />Bend Daily Tribune and in the South Bend Daily Times- This Board will give a hearing on <br />this resolution at its office in the City Hall on the 3 day of June 1902 at 7:15 P. M. <br />and will -receive bids up to 10 A. M. on the 16 day of "June 1902- <br />Engineer reported drawings and specifications for macadamizing east Marion <br />street from the east line of !Michigan street to the east line of: the Original Plat of <br />South Bend• <br />IMPROVEIIENT RE SJOLUTI ON NO • 68 - <br />Resolved by the Board of Public Works of the City of South Bend, Indiana: That <br />an improvement be made of the kind, size, location and terminal points as follows: The <br />paving of East Marion street with gravel and crushed stone macadam from the east line of <br />Michigan street to the east line of the Original Plat of South Bend- Said improvement <br />shall be known and designated as"Harion street macadam" and shall be constructed accord- <br />ing to the plans and specifications prepared by the City Civil Engineer, filed herewith. <br />Notice of this resolution and proposals for bids for the execution of the above work shall <br />be published on the 9 day of Kay and on the 16 day of Iuiay 1902, in the South Bend Daily <br />Tribune and in the South Bend Daily Timess This Board, will give a hearing on this reso- <br />lution at its office in the City Hall on the 3 day of June 1902 at 7:15 P. M. and will <br />receive bids up to 10 A• M• on the 16 day of June 1902- <br />`� <br />President- <br />