My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/1901 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1901
>
06/1901 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 2:31:33 PM
Creation date
2/13/2020 10:25:03 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
6/1/1901
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
65 <br />JUNE� 3.19010 <br />Street commissioner instructed to stop up all inlets for City drainage through the <br />old creek in Chapin Park and to get a list of property owners who use the old creek for the <br />purpose of private drainage. <br />Street commissioner instructed to investigate pavement in front of Wyman and Co. <br />and report cost of correcting defects• <br />Curbs on East Colfax Avenue between Frances and Eddy streets ordered set so as to <br />make the roadway 34 feet wide. <br />Petition of Henry Stegmann and others for cement curb on Wenger street from Carroll <br />street.to High street referred to the Engineer for specifications. <br />Contract for Water street water connections from Michigan street to Taylor street <br />awarded to B.Thomas Beardsley on condition of his furnishing a continuing bond before bee - <br />inning work. <br />Contract for Water street sewer connections from Michigan street to Taylor street <br />awarded to James Nelson& <br />Pre s ident . <br />
The URL can be used to link to this page
Your browser does not support the video tag.