My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/1901 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1901
>
05/1901 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 2:30:23 PM
Creation date
2/13/2020 10:05:05 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/1/1901
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MAY 7V I90is 7:I5 P.M. <br />First hearing on Improvement Resolution No. 9, for the construction of cement <br />sidewalks and curbs and the grading of B street. No remonstrances. The engineer filed <br />the estimated cost 0 I640.00 The board finds that the benefits , including the <br />benefits to the City,, are equal to the estimated cost of the improvement. Declaratory <br />resolution, for this improvement confirmed. <br />First hearing on Improvement resolution No. IO.for cement curb on Elder street... <br />No -remonstrances. The engineer filed the estimated cost, 0 427.90 The board finds that. <br />the benefits, in the benefits to the City, are equal to the estimated cost of <br />the improvement. Declaratory resolution for this improvement confirmed. <br />Contract for grading the alley between Notre Dame and Frances streets from <br />east Jefferson to east Wayne streets awarded to Siders Brothers. <br />First hearing on Improvement resolution NO. II, for paving Navarre street with <br />brick. No remonstrances. The engineer filed the estimated cost $ 884I.89 The board find <br />that the benefits, including the benefits to the City, are equal to the estimated cost <br />of the improvement. Declaratory resolution for this improvement confirmed. <br />Last hearing on the construction of water connections on north Taylor street <br />from west Washington street to Colfax Avenue -The final estimate allowed on April 29th. <br />I90I is hereby confirmed. No remonstrators appeared. <br />Last hearing on the construction of sewer connections on South Michigan. street. <br />No remonstrators appeared. The final estimate allowed on April 221, 1901 is hereby <br />confirmed. <br />Last hearing on the Construction of cement sidewalks on Kemble Avenue. No remon- <br />strators appeared. The final estimate allowed on April 25P I90I is hereby confirmed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.