My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Engineering Services for Lincoln Way West and Olive Street Intersection - Abonmarche Consultants, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Engineering Services for Lincoln Way West and Olive Street Intersection - Abonmarche Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 9:26:10 AM
Creation date
2/12/2020 10:29:45 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
2/11/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Existing approaches near the intersection will be evaluated to determine if access can be better <br />controlled by eliminating any approaches while not negatively impacting the use of any business. <br />Approaches will also be reduced in size to meet current City standards as appropriate. Sidewalks <br />within the project area will be replaced where they are in poor condition or as needed to improve <br />walkability and pedestrain access near the intersection. <br />A bus shelter will be included in both the eastbound and westbound direction with the exact <br />location coordinated with the City. <br />Lighting will be included along Lincoln Way within the project limits. Pedestrian level lighting is <br />aniticipated from Freemont Street to Elmer Street and roadway level lighting from Elmer Street to <br />Obrien Street. <br />The corridor will be evaluated for landscape improvements including trees and shrubs. The <br />existing vegetation will be evaluated and additional vegetation will be proposed to either replace or <br />supplement the existing trees and landscape. <br />Signage and striping within the project limits will be reviewed and replaced as necessary. <br />The existing traffic signal detection loops will be replaced with a FLIR detection system as well as <br />APS pedestrian push buttons. The improvements will be coordinated with City of South Bend <br />Traffic and Lighting for determination of existing signal equipment and the need for replacement of <br />the signal controller. The condition and location of the existing poles, mast arms, and signal heads <br />will be evaluated and are not anticipated to be replaced unless necessary. Traffic through the <br />intersection is understood to operate at a sufficient level of service and a study or modifications to <br />signal timing is not included in this project. <br />A1.02 Preliminary Design Phase <br />A. After acceptance by Owner of the Report and any other deliverables, selection by Owner of a <br />recommended solution and indication of any specific modifications or changes in the scope, extent, <br />character, or design requirements of the Project desired by Owner, and upon written authorization <br />from Owner, Engineer shall: <br />Prepare Preliminary Design Phase documents consisting of final design criteria, preliminary <br />drawings, outline specifications, and written descriptions of the Project. <br />2. Provide necessary field surveys and topographic and utility mapping for design purposes. <br />Utility mapping will be based upon information obtained from utility owners. <br />3. Advise Owner if additional reports, data, information, or services of the types described in <br />Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or <br />services. <br />Page 2 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.