Laserfiche WebLink
7. Handrails at Lodge 4,023.84 <br />See Change request 159 <br />8. Drink tops at Cafe Railing 3,447.90 <br />See change request 160 <br />9. Furnish and Install Park Mailbox 993.63 <br />See Change request 161 <br />10. Added relay to Ammonia/Fire Alarm 848.80 <br />See Change request 162 <br />11. Excavate for added foundations NW corner Community bld. 4,179.19 <br />See Change request 167 <br />12. Excavate for additional trench drain 905.47 <br />See Change request 168 <br />13. Wood Ceiling outside Cafe Bar 3,994.02 <br />See Change request 172 <br />14. Additional metal siding 4,594.37 <br />See Change request 174 <br />15. Credit trash cans and swap baby changing station-561.00 <br />See Change request 177 <br />16. Connect Heater from ASI #30 to DDC 2228.72 <br />See Change request 179 <br />Grand Total $40,441.13 <br />END OF CHANGE ORDER NO. 13 <br />