Laserfiche WebLink
OWNER: City of South Bend <br />Project Supervisor: Lochmueller Group, Inc. <br />Myron Cohagan <br />CONTRACTOR: Larson Danielson <br />PROJECT: Howard Park Redevelopment <br />Project No. 117-047-B <br />SUBJECT: Unexpected Construction Changes <br />ISSUE DATE: Jan. 3, 2020 <br />This Change Order to the Contract document shall supplement, amend, and shall <br />become a part <br />of, and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this <br />Change Order: <br />The following sections of the Contract Documents are revised as a result of the <br />above changes: <br />BIDDING D <br />UJWI�MUM:11111101VYZ <br />1. Increase wire size for fountain 2,055.35 <br />See Change Request 148 <br />2. Control Radiant Heaters w/on/off Switch 1,270.98 <br />See Change request 149 <br />3. Knox Boxes & Relocate Radiant Heaters Per ASI 38 2,119.79 <br />See Change Request 151 <br />4. Revise Grades at lodge 6,198.27 <br />See Change request 152 <br />5. Remove and replace unsuitable soils 1,759.82 <br />See Change request 153 <br />6. Revise Concrete Curb Grades (fire pits) 2,381.98 <br />See Change request 158 <br />