My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 02-16-79
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1970-1979
>
1979
>
RM 02-16-79
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2012 4:50:56 PM
Creation date
9/24/2012 4:09:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bed Redevelopment Commission <br />Regular eeting - February 16, 1979 <br />6. NEW BUSINESS (continued) <br />C. ommission approval of Change Order #2, Plaia CHANGE ORDER <br />onstruction Co., for an 'increase in contract #2, PLAIA <br />rice of $111.80 for an amended contract total CONSTRUCTION <br />f $24,221.80 at t e address 'of' 528 S. Olive St., CO. APPROVED <br />Outh Bend, Indiana, as Set forth in letter from <br />ames M. Harcus, Director, Bureau of Housinq. <br />uring a progress inspection of 528 S. Olive Street <br />he Bureau Inspector observed that two (2) sides of <br />his property were now without gutters. After care - <br />ul review, it was concluded that service to these <br />tems was now necessary. At the same time, the <br />nspector decided that two (2) porch storm doors <br />hould be deleted from specifications and that a <br />ain rear entrance, inside a screened porch should <br />e protected by a storm and screen door. Further, <br />he homeowner requested that a cylindrical lockset <br />pecification for a bedroom door be deleted. <br />r. Robinson made a motion to approve Change Order <br />2 with Plaia Construction Co., for an increase in <br />ontract price of $111.80, seconded by Mr. Cira, <br />nd the motion was unanimously carried. <br />d. ommission approval requested for Change" Order #1, CHANGE ORDER <br />arnes Electric Co., for an increase in contract #1, WITH <br />rice of $70.00 for an amended contract total of BARNES ELEC- <br />824.00 at the address of 528 S. Olive, South TRIC CO. <br />end, Indiana, as set forth in letter from APPROVED <br />lames M. Harcus, Director, Bureau of Housincx. <br />uring service of the above contract, general <br />onstruction contractor had to remove a light <br />ixture. While doing so, he discovered defective <br />iring. An investigation of this, and other fixtures <br />t 528 S. Olive Street determined that three (3) <br />ixtures required replacement. <br />Ir. Robinson made a motion to approve Change Order <br />#l, with Barnes Electric Co., for an increase in <br />: ontract price of $70.00, seconded by Ms. Auburn, <br />ind the motion was unanimously carried. <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.