My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 01-20-78
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1970-1979
>
1978
>
RM 01-20-78
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2012 5:07:35 PM
Creation date
9/24/2012 2:17:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6. NEW (BUSINESS <br />a. C mmission approval requested for Change Order No. 1, Charles Brown <br />Flaintenance Co., Inc. 1047'Georgiana Avenue; additional charges <br />f r installation of ceiling rafters on the front orch, remove <br />aid reinstall sheathing and felt and -installation of asphalt shingles <br />n t addition to the contract of $745.00. <br />Mr. Brownell read Mr. Pfeifer's memo with recommendation for approval <br />of change order. <br />Mr. Robinson: I can understand that they could not see this at the <br />time of inspection but on Item B where it says "remove and reinstall <br />sheathing and felt" did they really use the same sheathing that was <br />on top of the rafters previously or did they put in new sheathing and <br />his is something of a typographical error? Mr. Davis said that the <br />contractor had used new sheathing and felt. <br />Motion was made by Mr. Robinson, seconded by Mr. Wiggins and carried, <br />to approve Change Order #1 to Contract 3, <br />b. Commission approval re uested for the following four change orders, <br />#1,2,3,4 to Contract Set 04A,'Charles Brown Maintenance Co., Inc. <br />qeneral Construction Contract, Rehab Contract*Bureau of Housing South. <br />ange Order #1, 437 S. Pulaski Street, deletion of repairs to front <br />d rear porches, and addition of replacement of front porch, replace <br />orm doors, rear steps, and floor joists, for a net increase in contract <br />ice of $727. <br />. Robinson said he can agree with some of this but he questioned why <br />two doors weren't noticed during the initial inspection. That <br />)uld have been rather obvious. <br />r. Johnson said that we could certainly assume so but the present <br />ituation is that the storm doors have to be replaced. We did call for <br />ome repairs on both storm doors originally. <br />Dan Caesar asked where you find such an expensive aluminum combination <br />sto door. Mr. Brownell stated that the $125.00 charge for the door <br />includes the labor for installation. <br />Mr. (Caesar: Is that the usual cost Mr. Robinson, to install an aluminum <br />stor door - which costs in the neighborhood of $30.00 wholesale at best? <br />Mr. Johnson: In our program it is, the combination of solid door and storm <br />door{ would cost between $250 and $300. <br />Dan Caesar asked Mr. Robinson if that is the usual cost and Mr. Robinson <br />said that for a normal storm door, it is just a little bit high. If there <br />was a door there and they are replacing one with the frame, I wouldn't <br />feel $125. would be too conservative a figure, but from what Mr. Johnson <br />just said, I presume they have to do work on the inside door as well. <br />S&M <br />
The URL can be used to link to this page
Your browser does not support the video tag.