Laserfiche WebLink
Page 8 <br /> That Section 6-36.3 . (c) be amended as follows: <br /> (c) Fees. Each application for a permit for installation of <br /> heating, ventilating, air conditioning, and refrigeration equipment or <br /> systems shall be accompanied by fees in accordance with the schedule <br /> below. When the total capacity of any system in any single <br /> installation is provided by more than one (1) unit , the sum of the <br /> capacities of each unit and the total number of such units shall <br /> determine the fee. <br /> Space heaters, each 30,000 Btu input or more $15.00 <br /> Warm-air furnaces and unit heaters : <br /> Up to 300 ,000 Btu input : <br /> 607000-to-3007000-Btu-input: <br /> First unit 15.00 <br /> Second unit 10.00 <br /> 300 ,000 Btu input or more 25.00 <br /> Oil and gas conversions : <br /> Up to 300 ,000 Btu input : <br /> 607000-to-3007000-Btu-inputi <br /> First unit 15.00 <br /> Second unit 10 .00 <br /> 300 ,000 Btu input or more 25 .00 <br /> Electric furnaces (air handling) : <br /> Less than 100 kw input: <br /> First unit 15.00 <br /> Second unit 10 .00 <br /> 100 kw input or more 25.00 <br /> Modular-unit-air-conditioning 25 ee <br /> Air conditioning, central , electric : <br /> Bess-than-5-tons }5-8e <br /> Less than 5 tons: <br /> First unit $15.00 <br /> Second unit 10 .00 <br /> 5 to 10 tons 25.00 <br /> Over 10 tons 40 .00 <br /> Water chillers 75.00 <br /> Ventilating and exhaust systems: <br /> Less than 500 CFM capacity 5.00 <br /> 500 to 1,500 CFM capacity 10 .00 <br /> (Plus 1.00 for each 500 CFM or fraction <br /> thereof in excess of 1,500 CFM) <br /> Ventilating commercial hoods : <br /> 500 CFM to 1,500 CFM capacity 25 .00 <br /> Over 1 ,500 CFM capacity 50 .00 <br /> • <br />