My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8566-94 Amending Chapter 6 of Building
sbend
>
Public
>
Common Council
>
Legislation
>
Ordinances
>
1994
>
8566-94 Amending Chapter 6 of Building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2012 1:33:29 PM
Creation date
9/24/2012 1:33:28 PM
Metadata
Fields
Template:
City Council - City Clerk
City Council - Document Type
Ordinances
City Counci - Date
12/19/1994
Ord-Res Number
8566-94
Bill Number
122-94
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 9 <br /> Refrigeration and engine-driven, gas-fired or oil-fired <br /> cooling equipment : <br /> 1 to 5 horsepower, each 15 .00 <br /> 6 to 10 horsepower, each 25.00 <br /> More than 10 horsepower, each 40 .00 <br /> Incinerators : <br /> 5 cubic feet or less 10 .00 <br /> More than 5 cubic feet 10 .00 <br /> (Plus $1 .00 for each feet in excess of <br /> 5 cubic feet) <br /> Maximum fee 75 .00 <br /> Rooftop combination furnace and air conditioning units , <br /> 60 ,000 to 300 ,000 Btu's, each: <br /> Up to 7 1/2 tons 40 .00 <br /> 7 1/2 tons or more 60 .00 <br /> Heat pumps , 1,000 to 60,000 Btu's input : <br /> First unit 15.00 <br /> Each additional units 10 .00 <br /> 60 ,000 to 300 ,000 Btu's up to 7 1/2 tons, each40 .00 <br /> 7 1/2 tons or more, each 75 .00 <br /> Earth, coupled water source 50 .00 <br /> Boilers, steam or hot water, UP to 300 ,000 Btu's : <br /> Bailers7-steam-or-hot-aster7-697989-to-3007000-Btulst <br /> First unit 20 . 00 <br /> Each additional unit 15.00 <br /> 300 ,000 Btu' s or more 50. 00 <br /> Through-wall combination air conditioning/heating: <br /> First unit 10 .00 <br /> Each additional unit 5 .00 <br /> Solar heat units 50 .00 <br /> Air handlers: <br /> 400 CFM to 2,500 CFM 25 .00 <br /> Over 2 ,500 CFM 60 .00 <br /> Duct and register: <br /> Change fee 10.00 <br /> Plus each register and location change 2.00 <br /> Gas piping (distribution of piping to equipment) to be <br /> included on permit application: <br /> Each gas piping system of 1 to 4 outlets 3 .00 <br /> Each gas piping system of 5 or more, per outlet1.00 <br /> Each reinspection fee 25.00 <br /> Each additional final inspection 50 .00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.