My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Morris Theater Plaster Repair – Proj No 118-094R - Gibson-Lewis, LLC.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2020
>
Award Bids
>
Award Bid - Morris Theater Plaster Repair – Proj No 118-094R - Gibson-Lewis, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 10:12:11 AM
Creation date
1/15/2020 9:11:20 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/14/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GIBSON—LEWIS, LLC CONTRACTORS <br />1001 West 111h Street ♦ Mishawaka, IN 46544 # P.O. Box 488 + Mishawaka, IN 46546 <br />(574) 259-8581 * (574) 258-0932 FAX <br />Mortis 'err"orinina Arts Plaster Repair — Gibspti Lewis <br />November 261h, 2019 <br />Part II Bid Form <br />1. At least three plasterers working up to 60 hours a week for two weeks. If there <br />is added work, we will need a time extension because we cannot get more <br />plasterers. Carpenters will stay ahead of plasterers with anchors. Painters will <br />lag plasterers by three days to allow plaster to cure. We figured painting the <br />whole face of the light cove on all four domes (about 12 inches tall) so that <br />you cannot see patchwork at anchor bolts. This is the only paint we have <br />figured. Paint will be Sherwin Williams "Superpaint" in all one color. <br />2. Our only subcontractor will be Seaway Scaffolding Company. <br />3. Seaway Scaffolding Company <br />4. No, these are materials we use regularly. <br />Clarifications: <br />1. We did not include any Lead abatement. Our workers will utilize respirators <br />when necessary. <br />2. We figured the owner would provide a temporary storage area within the <br />building for the seats. <br />3. We do not include cleaning anything outside of our work area or final clean. <br />4. We will need an owner provided laydown area for scaffolding and 6 parking <br />spaces for workers. <br />5. We will match plaster texture as closely as possible but cannot guarantee an <br />exact texture match. <br />6. We do not have scaffolding out wide enough to access all sleeve points from <br />below. We assumed this work would take place solely in the attic. We have <br />included $2,400 for 12 of them. <br />7. We recognize the liquidated damages as the only damage provision. <br />8. We do not include any added cost that the owner might accrue from missing <br />an event. <br />Project Manager: Alan Loeffelholz <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.