Laserfiche WebLink
6. NEW <br />C. <br />BUSINESS (Cont'd)- <br />;hange Order No. 4 to Rehabilitation:Contract No. 54; in Southeast <br />CHANGE <br />;ode Enforcement Pro ram; Project'E-7: Commission approval was <br />ORDER NO.4 <br />^ equested for this Change Order, with Barany Sheet Metal & Heating <br />TO REHAB. <br />;ompany, for a decrease in contract amount of $10.00, (Contract: <br />CONTRACT 54 <br />56,327.50), or an amended contract total of $6,317.50, for rehabi- <br />APPROVED, <br />litation work at: 628 East Indiana Avenue, 'in' the Southeast Code <br />E -7 <br />.nforcement Program, Project E -7. <br />1st Floor Bathroom & West Hallway Floors <br />'he specifications called for securing the stairway handrail. The <br />iomeowner did this work himself, and, consequently, the contract <br />s being decreased by $10.00. <br />under water closet and install <br />1r. Wiggins moved for the approval of Change Order No. 4 to Re- <br />Fabilitation Contract No. 54, which is a decrease in contract <br />.mount of $10.00, or an amended contract total of $6,317.50, with <br />using waterproof adhesive. <br />;arany Sheet Metal & Heating Company, in the Southeast Code Enforce - <br />3) <br />ient Program, Project E -7. Motion was seconded by Mr. Cira and <br />arried. <br />Replace water closet and fixtures. <br />hange Order No. 5 to Rehabilitation Contract No. SECD /HR /CS -1/05, <br />CHANGE <br />n Southeast Community Development Housin Pro pram• Commission ap- <br />ORDER NO.5 <br />roval was requested for this Change Order, with Slatile Roofing & <br />TO REHAB. <br />heet Metal Company, for an increase in contract amount of $655.00, <br />,CONTRACT <br />Contract: $3,006.00 to amended amount of: $3,661.00), with the <br />SECD /HR /CS- <br />riginal contract set total of: $39,391.00 to amended amount of: <br />1/05 AP- <br />40,046.00, in the Southeast Community Development Housing Program. <br />PROVED, <br />ontract No. 5 rehabilitation work is at: 1532 Dunham Street. <br />SECD HOUSING <br />PROGRAM <br />he kitchen, bathroom and hallway floors were not included on <br />he specifications originally let for bids as part of the solution <br />D the problem which need correction. <br />he Chair called on Mr. Crighton for any further explanation of <br />his Change Order. Mr. Crighton advised this is based on Housing <br />llowance inspection and these items were not included on the <br />riginal <br />inspections. The additions are: <br />1) <br />1st Floor Kitchen & East Hallway Floors <br />Install 3/8" underlayment and <br />the using waterproof adhesive <br />$ 255.00 <br />2) <br />1st Floor Bathroom & West Hallway Floors <br />Replace 12 sq. ft. of subfloor <br />under water closet and install <br />3/8" underlayment and vinyl tiles <br />using waterproof adhesive. <br />250.00 <br />3) <br />1st Floor Bathroom Water Closet <br />Replace water closet and fixtures. <br />150.00 <br />Total <br />655.00 <br />1. Wiggins moved for the approval of Change Order No. 5 to <br />!habilitation Contract No. SECD /HR /CS -1/05, which is an in- <br />,ease in contract amount of $655.00, or an amended contract <br />►tal of $3,661.00. The original contract set total of $39,391.00 <br />; amended to $40,046.00, with Slatile Roofing &Sheet Metal <br />impany, in the Southeast Community Development Housing Program. <br />ition seconded by Mr. Robinson and carried. <br />8- <br />