My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 05-07-76
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1970-1979
>
1976
>
RM 05-07-76
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 7:31:41 PM
Creation date
9/21/2012 3:08:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6. NEW BU$INESS_(Cont'd) <br />taken to eliminate the problems. The actual increase is $40.00. <br />Motion was made by Mr. Wiggins, seconded by Mr. Cira and unani- <br />mously carried, for the approval of Change Order No. 1 to Rehabi- <br />litation Contract No. SECD /PR /CS -3/27, for an increase in contract <br />am unt of $40.00, or amended contract total of $3,060.00, which is <br />with Fleming Masonry Construction Company, in the Southeast Com- <br />mu ity Development Housing Program. <br />j. Change Order No. 1 t Rehabilitation Contract No: NWCD /03, in CHANGE ORDER <br />tha Northwest Community Develo ment" Program Commission approval NO. 1 TO <br />wa requested of Change Order No. 1 to Rehabilitation Contract No. REHABILITATION <br />NW D /03, with Slatile Roofing & Sheet Metal, Inc., for an increase CONTRACT NO. <br />in contract amount of $250.00, (Contract: $3,908.00), or an amended NWCD /03, AP- <br />co tract total of $4,158.00, for rehabilitation work at: 506 LaPorte PROVED, <br />Av nue, Northwest Community Development Program NWCD /03 <br />Mr Richard E. Pfeifer, Chief Inspector, for the Northwest Community <br />Development Program, in his memorandum advised that the specification <br />called for the installation of 3/8" plywood'underlayment and vinyl <br />ti e. In order for this work to be properly installed, the contrac- <br />tor had to remove the water closet and reinforce the floor joist <br />around the water closet thus detecting a rotted and leaking lead- <br />waste pipe, bath tub drain line and bath tub vent pipe. This plumbing <br />problem was unforeseeable at the time of the initial ' inspection and <br />should be corrected before any structural damage occurs. Staff re- <br />commends the items for the change order be approved. <br />Mo ion was made by Mr. Wiggins for the approval, seconded by Mr. <br />Do aldson and unanimously carried, of Change Order No. l to Rehabi- <br />li ation Contract No. NWCD /03, with Slatile Roofing & Sheet Metal, <br />In(., for an increase in contract amount of $250.00, or an amended <br />contract total of $4,158.00, with no change in contract time, in <br />tho Northwest Community Development Program. <br />7. PROGRESS REPORTS: <br />a. Morthly Reports, E -6 and Northwest Housing Program: This was a E -6 & <br />written memorandum submitted by Mr. John E. Davis, in which he NORTHWEST <br />advises work is continuing in the E -6 Code Enforcement Area. HOUSING <br />PROGRAM <br />Al o, Contract No. 24 was awarded to the Powell Construction REPORT <br />Co pany this month. A total of five contracts are presently being <br />co pleted. Physical rehabilitation has started in the Northwest <br />Co munity Development area. Progress in both projects is acceptable. <br />b. Community Development Pro ram Report for A ril, 1976: This written COMMUNITY <br />memorandum was submitted by Mr. Kenneth J. Schaller, Project Direc- DEVELOPMENT <br />tor, in which he advises nine (9) Notices to Proceed have been PROGRAM REPORT <br />issued during the month of April. Also, one structure rehabilita- <br />tion has been approved. Other contracts which have been awarded are <br />in the process of working toward a Preconstruction Conference. <br />Contract Set No. 4 is presently being advertised for bid. <br />- 16 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.