Laserfiche WebLink
6. NEW <br />f. <br />INESS (Cont'd <br />In his memorandum, Mr. Slabaugh advises the contractor, Nautilus <br />Construction Corporation, requests this change order to pay for 8.344 <br />cubic yards of Gabions placed in the river for bank stabilization. <br />This cost is the result of as -built quantity measurements and finals <br />the contract. Subject to Legal Counsel and HUD approval. <br />Mr Slabaugh further advised that he and George Batchelder who put <br />on a wet suit got down in the river and they measured everything <br />that was put in there. It came out there were 8.344 cubic yards <br />more Gabions than were on the bid estimate that the plan had called <br />for, so this change order is to final out the contract. That is <br />ho much more additional material the contractor put in. His measure - <br />me is all show that the plan is correct but that the bid was wrong, so <br />it is $500.60 more. <br />Commissioner Robinson asked if the contractor repaired the other ones <br />that were wide open and part of the material that was taken out of <br />it Mr. Slabaugh advised that the contractor did and we are ready <br />to build on what he has set a foundation for it- -it's a little wavy, <br />but it meets the specifications. Commissioner Robinson added that the <br />Zfi st time around the contractor didn't do too good .a job, so he just <br />wo dered if it has been corrected. <br />Mr. Wiggins made the motion, seconded by Mr. Robinson and carried, <br />Change Order No. 2 to Colfax /Pier Park Dredging Contract No. 1, with <br />Nautilus Construction Corporation, was approved for an increase in <br />co tract amount of $500.60, or an amended contract total of $49,786.60, <br />in Project Indiana R -66, subject to Legal Counsel and HUD approval. <br />Change Order No. 1 to Rehabilitation Contract No. 15, Southeast Project <br />E- • Commission approval was requested of Change Order No. 1 to <br />Re abilitation Contract No. 15, with Barany Sheet Metal & Heating <br />Company, for an increase in contract amount of $1,580.00, (Contract: <br />$5,700.00), or an amended contract total of: $7,280.00, for rehabili- <br />ta ion work at: 112 East Keasey Street, Southeast Project E -7. <br />Mr. Keith P. Crighton, Director, Bureau of Housing, advised this is ,,!one <br />of Barany Sheet Metal & Heating Company's last three contracts out of <br />total of 17 contracts he was awarded. At the time of inspection, the <br />water closet was requested to be repaired and the furnace was also <br />to be repaired. Those are the two items - -both are being deleted, <br />in amount of $105.00; and under the additions, the water closet is <br />being replaced, in amount of $110.00, and the furnace has been re- <br />paired under the Emergency Repair Program. The most costly item <br />on the change order is the addition of complete reroof (17 -1/3 <br />squares with 3 in l seal down asphalt shingles and installing <br />metal edging), in amount of $1,280.00. Since the time of inspection, <br />the roof has deteriorated to the point where we really should replace <br />it. The other items are: Route all plumbing lines through structure, <br />$165.00; Replace 15 feet of water lines in west section of basement, <br />$45.00; Rebuild 20 square feet of chimney, $85.00; totalling $1,685.00, <br />less $105.00 in deletions, or an increase to contract amount of $1,580.00. <br />ComTiissioner Wiggins asked to confirm that there wasn't even a repair item <br />for the roof originally -- confirmed by Mr. Crighton. Commissioner Cira <br />- 13 - <br />CHANGE <br />ORDER NO. <br />1 TO REHAB <br />CONTRACT <br />15 APPROVE <br />SE E -7 <br />