7. NqW BUSINESS (Cont'd
<br />f
<br />Change Order
<br />No. l
<br />to Rehabilitation Contract No. 51, South-
<br />CHANGE ORDER
<br />east Project
<br />E -7:
<br />Commission approval was requested of
<br />NO. 1 TO RE-
<br />Change Order
<br />No. l
<br />to Rehabilitation Contract No. 51, with
<br />HABILITATION
<br />Barany Sheet
<br />Metal
<br />& Heating Company, for a decrease in con-
<br />CONTRACT NO.
<br />tract amount
<br />of $60.00, (Contract: $7,103.00 , or an amended
<br />51 APPROVED,
<br />contract total of:
<br />$7,043.00, for rehabilitation work at:
<br />SOUTHEAST
<br />217 E. Dayton Street, in the Southeast Project E -7, per ex- PROJECT E -7
<br />planation in memorandum dated February 27, 1976, from Chief
<br />Inspector, Southeast Bureau of °Housing.
<br />Mr. Brownell read the memorandum which stated the specifica-
<br />tions called for the replacing of the water closet tank fix -
<br />tures and to increase water pressure. Since the time of the
<br />initial inspection, the homeowner has replaced the water
<br />closet, and, therefore, the change order is recommended for
<br />approval. The amount of deletion for this work is: $60.00.
<br />Motion was made by Mr. Cira, seconded by Mr. Donaldson and
<br />carried, for the approval of Change Order No. 1 to Rehabili-
<br />tation Contract No. 51, with Barany Sheet Metal & Heating
<br />Company, for a decrease in contract amount of $60.00, or
<br />an amended contract total of $7,043.00, with no change in
<br />contract time, in Southeast Project E -7.
<br />g.1 Change Order No. 2 to Rehabilitation Contract No. 54, South- CHANGE ORDER
<br />east Project E -7: Commission approval was requested of NO. 2 TO RE-
<br />Change Order No. 2 to Rehabilitation Contract No. 54, with HABILITATION
<br />Barany Sheet Metal & Heating Company, for an increase in CONTRACT NO.
<br />contract amount of $160.50, (Contract: $5,912.00), or an 54 APPROVED,
<br />amended contract total of: $6,072.50, for rehabilitation SOUTHEAST
<br />work at: 628 E. Indiana Avenue, in the Southeast Project PROJECT E -7
<br />E -7, per explanation in memorandum dated February 27, 1976,
<br />from Chief Inspector, Southeast Bureau of Housing.
<br />Mr. Brownell read the memorandum and change order which
<br />stated that the specifications conformed the plumbing and
<br />the beams, in the basement, and called for rehanging 39' of
<br />gutters on the west side. Since the time of the initial
<br />inspection, the plug in the soil pipe has begun to leak
<br />and one (1) jack post is needed in the center of the base-
<br />ment where the old furnace was located, and the gutters
<br />have been destroyed by ice and snow. This change order
<br />was recommended for approval. The additional charge for
<br />the work and materials is $185.50, less a credit of $25.00
<br />for the rehanging of the gutters on the west side, formerly
<br />in the specifications, or a total increase to the contract
<br />amount of $160.50.
<br />Commissioner Cira asked Mr. Crighton what lapse of time
<br />do we have from initial inspection to this increase of cost
<br />that would occur, and he advised the gutters here in this
<br />instance occurred during the last pre -thaw that we had.
<br />From the ground level, it is impossible to check what condi-
<br />tion the gutters were in. Generally, our inspectors, if they
<br />- 12 -