7. NSW BUSINESS (Cont'd) <br />second floor bathroom, and repair tub valve. The work totals <br />$186.00. <br />Motion was made by Mr. Donaldson, seconded by Mr. Cira and <br />carried, for the approval of Change Order No. 2 to Rehabili- <br />tation Contract No. 28, with Area Services, Inc., for an in- <br />crease in contract amount of $186.00, or an amended contract <br />total of $7,629.32, with no change in contract time, in <br />Southeast Project E -7. <br />e. Change Order No. 1 to Rehabilitation Contract No. 50, South- <br />east Project E -7: Commission approval was requested of <br />Change Order No. 1 to Rehabilitation Contract No. 50, with <br />Barany Sheet Metal & Heating Company, for an increase in <br />contract amount of $75.00, (Contract: $6,380.50), or an <br />amended contract total of: $6,455.50, for rehabilitation <br />work at: 621 E. Keasey Street, in the Southeast Project <br />E -7, per explanation in memoranda dated February 26 and 27, <br />1976, from Chief Inspector, Southeast Bureau of Housing. <br />Mr. Brownell read these in their entirety also. <br />The specifications called for the roof to be replaced over <br />the front and rear porch, the kitchen area, and for the gas <br />boiler to be replaced. Since the time of the initial in- <br />spection, the homeowner has had the roof repaired, and the <br />contractor states, in writing, that the radiator system has <br />not been used in ten (10) years and questioned the adequacy <br />of the system. The homeowner has completed her roof and <br />there is enough money in the existing contract for the <br />boiler to allow a very small increase in the contract amount, <br />and therefore the Chief Inspector has recommended the change <br />order for approval. <br />The 130,000 BTU counter flow furnace, per South Bend Code, <br />including seven hot air ducts and three cold air ducts, and <br />removal of boiler pipes and radiators, totals $1,350.00. The <br />work that is to be deleted amounts to a decrease in the speci- <br />fication amount of $1,275.00, which was for installation of <br />roll roofing at rear kitchen area, 15' x 24'; rear porch 50'; <br />front porch 190' ($325.00); the installing of gas hot water <br />boiler in place of present oil, using same piping, ($950.00), <br />or total decrease of $1,275.00. The difference in amount for <br />the above changes is $75.00, an increase.to contract. <br />Motion was made by Mr. Cira, seconded by Mr. Donaldson and <br />carried, for the approval of Change Order No. 1 to Rehabili- <br />tation Contract No. 50, with Barany Sheet Metal & Heating <br />Company, for an increase in contract amount of $75.00, or <br />an amended contract total of $6,455.50, with no change in <br />contract time, in Southeast Project E -7. <br />- 11 - <br />CHANGE ORDER <br />NO. 1 TO RE- <br />HABILITATION <br />CONTRACT NO. <br />50 APPROVED, <br />SOUTHEAST <br />PROJECT E -7 <br />