My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 01-16-76 (2)
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1970-1979
>
1976
>
RM 01-16-76 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2012 9:15:03 AM
Creation date
9/21/2012 2:23:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
N <br />NEW BUSINESS (Cont'd) <br />Motion was made by Mr. Wiggins, seconded by Mr.' Cira and unani- <br />mously carried, to reject Rehabilitation Contract No. O10 /NWCD, <br />as per bid amount of 9,003.00, from Madison Builders, Inc., <br />as it is over the $8,000.00 maximum allowable under guidelines. <br />f Change Order No 2 to Rehabilitation Contract No. 16, Southeast <br />Project E -7: Commission approval was requested of Change Order <br />No. 2 to Rehabilitation Contract No. 16, with Ted Combs Decora- <br />ting & Construction, Inc., for an increase in contract amount <br />of $689.30, (Contract: $6,958.39), or an amended contract <br />total of: $7,647.69, for rehabilitation work at: 1121 South <br />Carroll Street, in the Southeast Project E -7, per explanation <br />in memorandum dated January 14, from Chief Inspector, Mr. James <br />L. Johnson, Jr., Southeast Bureau of Housing, E -7. <br />Mr. Brownell read the memorandum from Mr. Johnson in its en- <br />tirety, which stated the specifications confirmed the furnace <br />and water heater and called for reroofing the rear porch and <br />for replacing siding 3' x 28' on the south side 6' front, <br />16' in rear, and paint two coats. Since the time of the initial <br />inspection, the condition of the above - mentioned items have <br />changed as follows: <br />1. The furnace blower motor, fan switch, fuse disconnect, <br />and the wiring have gone bad. <br />2. The water heater has no pipe leading from the pressure <br />release valve to 6" above the floor, which is contrary <br />to South Bend Code. <br />3. The sheathing of the rear porch roof has deteriorated <br />due to leakage through the roofing and will not allow <br />the contractor to properly install the roofing called <br />for on the specifications. <br />4. Although some of the rotten siding has been replaced, <br />there is still 112 square feet to be replaced which <br />may not have been seen at the time of the initial <br />inspection. <br />These conditions present a serious health and safety problem <br />and should be corrected immediately; therefore, the change <br />order is recommended for approval and brought before the <br />Commission for consideration. <br />Mr. Wiggins moved for the approval of Change Order No. 2 to <br />Rehabilitation Contract No. 16, for an increase in contract <br />amount of $689.30, or an amended contract total of: $7,647.69, <br />and contract time remains unchanged, with Ted Combs Decorating <br />& Construction, Inc., Southeast Bureau of Housing E -7 Project. <br />CHANGE <br />ORDER NO.2 <br />TO REHAB. <br />CONTRACT <br />16, AP- <br />PROVED, <br />E -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.