Laserfiche WebLink
6. NtW BUSINESS (Cont'd <br />J <br />Plaza Park Contract No: l: The previous bids received for <br />Plaza Park Contract No. l were rejected, conditional award <br />rescinded and approval given to re- advertise Contract No. 1 <br />in Commission meeting of March 21, 1975. HUD had advised <br />the only apparent action open at this point to proceed with <br />the project is to re- advertise Contract No 1, with the scope <br />reduced so that the low bid will be within the revised estimate. <br />Consequently, a base contract and alternates were set up to keep <br />the project within the budget available and within the revised <br />Engineer's estimate. <br />The invitation for bids appeared in The South Bend Tribune and <br />the Tri- County News on March 28 and April 4, 1975, for bids <br />on: <br />Contract 1• <br />Construction of Plaza Park including brick paving, asphalt <br />paving, boat slips and pier, timber piling, reinforced con- <br />crete construction, wood improvements to existing Railroad <br />Bridge, kiosks, drinking water fountains, pavement removal, <br />misc. demolition, earthwork, exposed aggregate paving, <br />gabions, sculpture pedestal and benches. <br />Contract 3• <br />Electrical service and lighting. <br />The bid opening was at 10:00 a.m., E.S.T., on April 11, 1975, <br />in the Office of the Department of Redevelopment. The following <br />bids were received and publicly opened: <br />.Alternate Alternate <br />of Contractor (Contract #1 ) Base Bid A B <br />1)* <br />Nautilus Construction Corp. <br />$171,349.50 <br />$ 627.00 <br />$ 1,799.50 <br />2)* <br />Arco Engineering <br />Construction <br />215,220.65 <br />957.95 <br />1,993.25 <br />3)* <br />The Hickey Co., <br />Inc. <br />247,448.50 <br />882.39 <br />2,032.26 <br />4)* <br />Carl J. Reinke & <br />Sons, Inc. <br />329,261.35 <br />829.60 <br />2,668.80 <br />Alternate Alternate <br />Alternate <br />Alternate <br />Alternate <br />C <br />D <br />E <br />F <br />G <br />1)* <br />$ 871.00 $ <br />5,19 1.00 <br />$ 4,169.50 <br />$ 7,453.00 <br />$ 4,169.50 <br />2)* <br />1,032.15 <br />6,768.75 <br />5,305.05 <br />9,123.40 <br />5,305.05 <br />3)* <br />998.84 <br />7,873.01 <br />6,112.01 <br />10,163.89 <br />6,112.01 <br />4)* <br />1,118.40 <br />6,087.80 <br />4,616.80 <br />8,498.00 <br />4,759.80 <br />Alternate Alternate <br />Alternate <br />Alternate <br />Alternate <br />H <br />I <br />J <br />.K <br />L <br />1)* <br />777.00 $ <br />4,400.00 <br />$ 2,716.00 <br />$ 1,236.50 <br />$ 4,032.50 <br />2)* <br />1,233.75 <br />4,520.00 <br />3,875.10 <br />2,585.70 <br />8,432.10 <br />3)* <br />1,114.55 <br />4,480.00 <br />2,436.89 <br />2,052.99 <br />6,694.95 <br />4)* <br />1,067.40 <br />5,760.00 <br />5,384.60 <br />2,224.80 <br />7,255.20 <br />- 7 - <br />PLAZA PARK <br />CONTRACT <br />NO. 1 <br />AWARDED TO: <br />NAUTILUS <br />CONSTRUCTION <br />CORPORATION, <br />R -66 <br />