6. NtW BUSINESS (Cont'd
<br />J
<br />Plaza Park Contract No: l: The previous bids received for
<br />Plaza Park Contract No. l were rejected, conditional award
<br />rescinded and approval given to re- advertise Contract No. 1
<br />in Commission meeting of March 21, 1975. HUD had advised
<br />the only apparent action open at this point to proceed with
<br />the project is to re- advertise Contract No 1, with the scope
<br />reduced so that the low bid will be within the revised estimate.
<br />Consequently, a base contract and alternates were set up to keep
<br />the project within the budget available and within the revised
<br />Engineer's estimate.
<br />The invitation for bids appeared in The South Bend Tribune and
<br />the Tri- County News on March 28 and April 4, 1975, for bids
<br />on:
<br />Contract 1•
<br />Construction of Plaza Park including brick paving, asphalt
<br />paving, boat slips and pier, timber piling, reinforced con-
<br />crete construction, wood improvements to existing Railroad
<br />Bridge, kiosks, drinking water fountains, pavement removal,
<br />misc. demolition, earthwork, exposed aggregate paving,
<br />gabions, sculpture pedestal and benches.
<br />Contract 3•
<br />Electrical service and lighting.
<br />The bid opening was at 10:00 a.m., E.S.T., on April 11, 1975,
<br />in the Office of the Department of Redevelopment. The following
<br />bids were received and publicly opened:
<br />.Alternate Alternate
<br />of Contractor (Contract #1 ) Base Bid A B
<br />1)*
<br />Nautilus Construction Corp.
<br />$171,349.50
<br />$ 627.00
<br />$ 1,799.50
<br />2)*
<br />Arco Engineering
<br />Construction
<br />215,220.65
<br />957.95
<br />1,993.25
<br />3)*
<br />The Hickey Co.,
<br />Inc.
<br />247,448.50
<br />882.39
<br />2,032.26
<br />4)*
<br />Carl J. Reinke &
<br />Sons, Inc.
<br />329,261.35
<br />829.60
<br />2,668.80
<br />Alternate Alternate
<br />Alternate
<br />Alternate
<br />Alternate
<br />C
<br />D
<br />E
<br />F
<br />G
<br />1)*
<br />$ 871.00 $
<br />5,19 1.00
<br />$ 4,169.50
<br />$ 7,453.00
<br />$ 4,169.50
<br />2)*
<br />1,032.15
<br />6,768.75
<br />5,305.05
<br />9,123.40
<br />5,305.05
<br />3)*
<br />998.84
<br />7,873.01
<br />6,112.01
<br />10,163.89
<br />6,112.01
<br />4)*
<br />1,118.40
<br />6,087.80
<br />4,616.80
<br />8,498.00
<br />4,759.80
<br />Alternate Alternate
<br />Alternate
<br />Alternate
<br />Alternate
<br />H
<br />I
<br />J
<br />.K
<br />L
<br />1)*
<br />777.00 $
<br />4,400.00
<br />$ 2,716.00
<br />$ 1,236.50
<br />$ 4,032.50
<br />2)*
<br />1,233.75
<br />4,520.00
<br />3,875.10
<br />2,585.70
<br />8,432.10
<br />3)*
<br />1,114.55
<br />4,480.00
<br />2,436.89
<br />2,052.99
<br />6,694.95
<br />4)*
<br />1,067.40
<br />5,760.00
<br />5,384.60
<br />2,224.80
<br />7,255.20
<br />- 7 -
<br />PLAZA PARK
<br />CONTRACT
<br />NO. 1
<br />AWARDED TO:
<br />NAUTILUS
<br />CONSTRUCTION
<br />CORPORATION,
<br />R -66
<br />
|