My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA- Bowman Creek Improvements at Lincoln Way East – WBK Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
PSA- Bowman Creek Improvements at Lincoln Way East – WBK Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 8:53:55 AM
Creation date
12/23/2019 11:41:47 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WBK Opportunity No. 2019.0206 <br />This task also includes project management effort including internal staffing, scheduling, coordination and meetings, <br />billing, and Quality Assurance of deliverables. <br />Task 4 1 Plat of Survey (Boundary) <br />WBK will engage with a Professional Land Surveyor via a sub -consultant agreement to complete a boundary survey and <br />investigation of easements as requested. The agreement will be authorized between WBK and the sub -consultant. The <br />scope and budget for the Task 4 1 Plat of Survey (Boundary) is provided as an appendix to this document and the <br />Estimate of Fees table below has been revised to reflect this request. <br />Project Assumptions <br />In preparing this proposal, we have attempted to provide you with a complete package of the engineering services <br />anticipated at this point in time. In doing so, we have made some assumptions which will need to be verified during <br />the engineering process. Any findings which are not consistent with our assumptions may increase the engineering <br />budget for this project. We will thoroughly discuss any such findings with you and negotiate any budget revisions prior <br />to proceeding. Our assumptions are as follows: <br />That the site was never used for storage of hazardous materials, and therefore the cost of an environmental <br />assessment, mitigation, clean-up and permitting services are not included. <br />That there will be no modifications to existing adjacent streets. <br />That the property has been monumented with iron pipes or similar markers that correspond to the Plat of <br />Survey, which will be provided to us by others, and that a reliable vertical benchmark is within 500 feet of the <br />project site. <br />Estimate of Fees <br />Due to the nature of the tasks listed in the above Scope of Basic Services, we have provided time and material budgets. <br />The actual amount invoiced will be based on the level of effort required to accomplish the task, but we will not exceed <br />the budget without your prior approval. Our estimated fees are based on the entire Scope of Basic Services being <br />awarded to us. In general, individual tasks cannot be broken out and awarded separately. <br />Task # Task Name Fee <br />Task 1 Topographic Survey $7,900 <br />...... .............. . ...„.,„..... .......... ........... <br />., <br />Task 2 Concept Engineering and Concept Site Plan $16,500 <br />Task 3 Project Management and Meetings $11,000 <br />Task 4 Plat of Survey (Boundary) $4,700 <br />TOTAL $40,100 <br />Reimbursable Costs (Including Printing) Cost + 10% <br />Please note that preparing this proposal requires the exercise of professional knowledge and judgment, and as such, <br />this proposal remains the proprietary instrument of service of the firm WBK Engineering, LLC. No portion of this <br />proposal may be shared with another firm providing similar services without our permission. <br />Proposal for Professional Services — Bowman Creek Concept Engineering Page 3 of 4 <br />December 9, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.