PSA- Bowman Creek Improvements at Lincoln Way East – WBK Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
PSA- Bowman Creek Improvements at Lincoln Way East – WBK Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 8:53:55 AM
Creation date
12/23/2019 11:41:47 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WBK Opportunity No. 2019.0206 <br />Deliverable: Existing conditions drawing with contours, adjacent parking lot, normal water levels, trees, and other <br />physical features to describe the existing conditions. <br />Task 2 1 Concept Engineering & Concept Site Plan <br />Kickoff Meeting: We will meet with the City to discuss objectives, schedule and budgets (engineering and <br />construction). We will also develop a matrix of priorities to determine critical elements of the plan, and those <br />elements on the City's "wish list". This meeting will help us in developing a framework of design elements to include in <br />the conceptual plan. <br />Site Reconnaissance: An investigation of the project site will be made to identify site constraints and opportunities, <br />utility locations, field verify the topographic data by WBK, and evaluate existing drainage conditions and wetland <br />boundaries. This site reconnaissance will be attended by an engineer and biologist. <br />Stakeholder Meeting #1: We will attend one meeting with local property owners to discuss the project and collect <br />feedback prior to beginning concept design. <br />Concept Engineering Plans/renderings: WBK will prepare a maximum of three concept engineering plans for the site. <br />Alternate concept plans will include different items and site layouts for the City's evaluation. These alternatives may <br />have different methods for streambank stabilization, path location, access points, and landscaping. We will work with <br />the City during the developments of these alternatives to best meet the City's needs. These alternatives will also be <br />developed taking into considerations permitting requirements and possible permitting obstacles. We anticipate each <br />plan alternative will consist of one overall sheet with proposed site improvements and possible cross sections of creek <br />at critical locations. <br />Concept cost estimate: WBK will develop estimates of cost for elements of the project for each of the three <br />alternatives. We will use current bid tabulations to develop an accurate estimate of costs. We will include elements of <br />the project that are within the framework of amenities and within the project budget as outlined in the kickoff <br />meeting. <br />Summary Memo: This will include preparation of a memo summarizing the proposed alternatives listing the included <br />improvements, the pros and cons of each alternative, summary of costs, and recommendation for a selected <br />alternative. We anticipate sending a draft of the memo to your office for review prior to finalizing the memo. <br />Deliverable: Up to three concept site engineering plans with associated conceptual cost estimates and memo <br />outlining the three alternatives, pros and cons, and recommendation. <br />Task 3 1 Project Management and Meetings: <br />WBK anticipates additional meetings throughout the project for coordination and consensus on the plans. The <br />anticipated meetings include: <br />Stakeholder Meeting #2: We will attend one (1) meeting with other community stakeholders to be identified and <br />organized by the City. <br />Stakeholder Meeting #3: We will attend one (1) meeting with relevant permitting agency representatives to collect <br />feedback relating to permitting and feasibility of implementing future concept plans. <br />Staff Meetings: We participate in two (2) staff meetings at the City to collect feedback and share progress during the <br />concept design process. <br />Coordination Meetings: We will participate in three (3) phone coordination meetings with staff and relevant parties <br />throughout the concept design process. <br />This task does not include public presentation, which would be charged at an hourly rate as needed. <br />Proposal for Professional Services — Bowman Creek Concept Engineering Page 2 of 4 <br />December 9, 2019 <br />