Laserfiche WebLink
7. IRVYISe tl ria+ary_. s l-ia apt <br />0wffeF!s--o0FAffieRtS,--ion of pfebable Ge"IstfU01H <br />any 4it=1* rW'1"1i=—'a"z�FdBf�li—Eh art <br />WBK will coordinate with the Client to determine the final nunrlrer o ''r eij.yed y rr"t <br />and an,v other- delirerabkv to be t rovieled ivithin a reavoneible tiinekime based on the <br />overall PmLecischedule, to be delerrnined <br />B. Engineer's services under the Preliminary Design Phase will be considered complete on the date <br />when the revised Preliminary Design Phase documents, revised opinion of probable Construction <br />Cost, and any other deliverables have been delivered to Owner. <br />1.03 <br />er-t-r&rt�yDes `IrIC� opinion -of <br />" , and any othe <br />y extent, ; <br />itt n-&4 l=i ttion Ar."Nom <br />fiftiiieef. <br />I;kt"�—x�rr-xxrca iat �1�� <br />aSS. <br />411"" . . <br />Of , t tt 4 I S <br />P rplfa l ry stet ` " 1f rsin <br />kom the <br />G"Ier 11 at�l�l it -�mak , <br />me <br />ealelidur <br />ti+arr <br />IN <br />NMI I.M. 0-115M <br />Page 3 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />