My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA- Bowman Creek Improvements at Lincoln Way East – WBK Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
PSA- Bowman Creek Improvements at Lincoln Way East – WBK Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 8:53:55 AM
Creation date
12/23/2019 11:41:47 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
which provides the material deliverables with su acient time to review and provide <br />comments Wide meelitzg overall deadlines o the 'il . <br />8 appFepi' <br />. <br />, <br />WBK will coordinate with the Client to determine the Inal number o revised report copies <br />and arry other deliverables to be vrovicled within a reasonable tirnekame based on the <br />overallaro ect schedule to be determined <br />B. Engineer's services under the Study and Report Phase will be considered complete on the date <br />when the revised Report and any other deliverables have been delivered to Owner. <br />A1.02 Preliminary Design Phase <br />A. After acceptance by Owner of the Report and any other deliverables, selection by Owner of a <br />recommended solution and indication of any specific modifications or changes in the scope, extent, <br />character, or design requirements of the Project desired by Owner, and upon written authorization <br />from Owner, Engineer shall: <br />1. Prepare Preliminary Design Phase documents consisting of final design criteria, preliminary <br />drawings, outline specifications, and written descriptions of the Project. <br />2. Provide necessary field surveys and topographic and utility mapping for design purposes. <br />Utility mapping will be based upon information obtained from utility owners. <br />Advise Owner if additional reports, data, information, or services of the types described in <br />Exhibit B are necessary and assist Owner in obtaining such reports, data, information, or <br />services. <br />4. Based on the information contained in the Preliminary Design Phase documents, prepare a <br />revised opinion of probable Construction Cost, and assist Owner in collating the various <br />cost categories which comprise Total Project Costs. <br />5. Perform or provide the following additional Preliminary Design Phase tasks or deliverables: <br />A ntetvitnum o `three ahernate solutions with conceptual cost estimates a metnorandurn <br />summari in, the conce. tv and attendance at stakeholder meettri :i. <br />6. lHisv i . <br />r this, <br />th <br />and e r '1�pN®'�" TA uto n rrr"b eF 4.�. <br />, <br />Eilig,meef aiiy a Se ddoeunien's and ahly other <br />WBK will coordinate with the Client to determine the final number o °revigiv copies and <br />any other deliverables. 1,V. K will coordinate ivith the Client to establish a as Wect schedule <br />which provides the material deliverables with sufficient time to review and provide <br />comments ivhile rneetin , overall deadlines o "the Clt <br />Page 2 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.