Laserfiche WebLink
WEAVER CONSULTANTS GROUP <br />FEESCHEDULE <br />(Effective January 1, 2018) <br />VI. TESTING AND EQUIPMENT RENTAL FEES <br />Unit <br />U.S. $ <br />a) <br />pH, Specific Conductance and Temperature Meter.,......„„„„...,.......,„ ............... .......... <br />.......... ..„.„....„„,.. Day <br />85.00 <br />b) <br />Peristaltic Filter Pump ... ... .......................................... ..... „....... . ......... <br />...................... Day <br />40.00 <br />c) <br />Electric Purge Pump........................................................................................................................ <br />Day <br />45.00 <br />d) <br />Grundfos Pump Control Box.........,, „, ............ ......... .......... ............................... <br />Day <br />110.00 <br />e) <br />Water Level Indicator...................................................................................................................... <br />Day <br />35.00 <br />f) <br />Filter and Hose (for pump) ._..... ..................... <br />......,.,.,,.... Ea <br />22.00 <br />g) <br />Micropurge Flow Cell and Sonde.................................................................................................... <br />Day <br />130.00 <br />h) <br />Modified Level "D" (Tyveks, Boots, Gloves)/per person/per change of clothing ........................... <br />Ea <br />53.00 <br />i) <br />Photoionization Detector Meter ................ ... _......... ,,.. ........ <br />,............ .,.,,,. Day <br />116.00 <br />j) <br />Nuclear Density Gauge.................................................................................................................... <br />Day <br />70.00 <br />NuclearDensity Gauge .......................................... ................ .................... ...............„..,...„...,,...„...... <br />Wk <br />300.00 <br />k) <br />Air Sampling Equipment, per pump................................................................................................ <br />Day <br />53.00 <br />1) <br />Hand Operated Field Probe Equipment....................................................................„.,.,....„,..„......... <br />Day <br />30.00 <br />m) <br />Explosimeter................................................ „......... .............................. <br />Day <br />35.00 <br />n) <br />Gas Analyzer .. ........................... ,................ ... . ........ <br />...., .......„. Day <br />190.00 <br />o) <br />Flame Ionization Detector ,.....„„ ........„ <br />..... Day <br />265.00 <br />p) <br />Interface Probe................................................................................................................................. <br />Day <br />55.00 <br />q) <br />ATV.................................................................................................................................................. <br />Day <br />53.00 <br />r) <br />Company Truck ........ .-..... ..... ......... ......... ......... <br />. ........ ......... Day <br />95.00 <br />Company Truck (does not include fuel or mileage)„„,.....„,„...................„.....................................,,.. <br />Wk <br />450.00 <br />s) <br />Hand -Held Field GPS/G15..„.... .................. ......... ......... <br />..... ..,...., Day <br />158.00 <br />t) <br />Laser Level .................. ......... ......... ......, <br />....... Day <br />79.00 <br />u) <br />Ground Penetrating Radar ,,.,,.,. . ........ . ........ <br />.... Day <br />250.00 <br />v) <br />Geonics EM-61 .......... .. ..............„.„... <br />....„„..„. .„.,..... Day <br />525.00 <br />w) <br />Survey Grade GPS Unit................................................................................................................... <br />Day <br />360.00 <br />x) <br />Electric Generator,.....,. . .... ........ ...... ,.. .......,.... ,.,,..... <br />......,. .......,, Day <br />69.00 <br />y) <br />Slug Test Equipment ..........................„„,...... ..,...... ......... ._...................,,....„„„„.... <br />..„,„.... Day <br />210.00 <br />z) <br />All Weather Key Alike Locks......................................................................................................... <br />Ea <br />20.00 <br />aa) <br />Equipment Trailer......„„ ___ ....... ...,„....................................... <br />Day <br />79.00 <br />bb) <br />Fluk Meter/Volt Meter/Loop Calibrator.......................................................................................... <br />Day <br />126.00 <br />cc) <br />Four Gas Meter„....,..„... ....... ..... ........................................... ....„...._... ........ <br />........... ....... Day <br />20.00 <br />1. All professional, technical, and support staff time and expenses spent in furtherance of the client's work will be billed. This includes, but is not limited to, proposal, field, <br />travel, research, technical review and reporting, project management, client meeting, and project -specific administrative support. <br />2. An overtime rate of 1.3 times the regular rate is billed for technical and support staff services for work in excess of 40 hours per week, work between 7:00 p.m. to 5:00 a.m., <br />and work on Saturdays. This overtime rate is increased to 2.0 times the regular rate for work on Sundays and holidays. <br />3. Unless otherwise agreed to in writing, a monthly interest charge of 18% per annum, will be charged accruing from the date of invoice, on all invoices not paid within 30 <br />days. <br />4. The unit rates are subject to periodic modification (typically annually). These rate modifications will be incorporated into long-term projects, unless otherwise addressed in <br />the project contract. <br />5. Litigation Support and Expert Witness services will be charged at a Senior Principal rate of $250/hour. Deposition and testimony services are charged at 1.5 times the <br />Senior Principal billing rate. <br />1. Rates quoted are for expenses only, equipment purchased on the client's behalf is marked up 25%. <br />2. Personnel rates are billed separately from general expenses. <br />3. Standard non -disposable protective outer -wear or equipment damaged or contaminated by site conditions are billed at replacement cost plus 30%. <br />4. General expense mark-ups may be negotiated based upon contract size and payment terms. <br />5. The per diem rates set forth above are the standard rates we typically use for our technical staff on projects. We reserve the right to modify these rates in high cost areas. <br />6. Mileage rate is based on gasoline price of $3.50 per gallon. A fuel surcharge maybe added if a condition beyond Weaver Consultants Group control warrants it. <br />TESTING AND EQUIPMENT RENTAL NOTES: <br />1. Rates for testing and equipment not listed above are available on request. <br />2. Testing and equipment rental costs are negotiable for specific projects and for on -site laboratory programs. <br />3. Laboratory unit prices cover equipment and labor costs to perform standard test procedures and laboratory reports with normal tum-around times. Non-standard testing requirements, <br />supervisory and project management costs, data evaluation costs, and environmental sample disposal costs are not included in the testing unit prices and are billed separately. <br />4. Equipment rental rates are for equipment costs only. Transportation, calibration and personnel costs are billed separately. <br />5. Daily and weekly rates cover a maximum of 10 and 50 hours respectively. <br />6. SAMPLES WILL NOT BE RETAINED beyond classification and testing unless other arrangements are agreed to in writing. Environmental samples remain the property of the client. <br />Any modification to this fee schedule requires the written approval of Weaver Consultants Group <br />k\ProposahAttachments_North Central\Fee Schedule\WCG Fee Sched effective Jan 12019.,do- Page 2 of 2 <br />