My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - Light-Up South Bend – Lighted Decorative Bollard Replacements – Proj No. 119-005B - All Phase Electric Supply
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Award Quotations/Proposals
>
Award Quote - Light-Up South Bend – Lighted Decorative Bollard Replacements – Proj No. 119-005B - All Phase Electric Supply
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 10:10:35 AM
Creation date
12/23/2019 10:49:57 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPECIFICATIONS <br />CITY OF SOUTH BEND - <br />QUOTE NAME 119-005B Lighted Decorative Bollard Replacements <br />FOR QUOTES DUE December 101h 2019 by 9:30 AM Local Time <br />Pursuant to notices given, the undersigned offers Quote(s) to the City of South Bend in accordance with <br />the following attachment(s) which specify the class or item number or description, quantity, unit, unit price. <br />F.O.B destination is the City of South Bend VPA Facilities and Grounds Headquarters. <br />Delivery Address <br />1020 High Street <br />South Bend, IN 46601 <br />1.. DESCRIPTION <br />A. This project includes the furnishing of all materials needed to install lighted decorative bollard <br />replacements at existing locations within the City of South Bend, IN. The City of South Bend <br />intends to install the lighted decorative bollard replacements with their own forces. <br />II. PREVAILING SPECIFCIATIONS AND DESIGN & CONSTRUCTION STANDARDS <br />A. The City of South Bend's PREVAILING SPECIFICATIONS, most recent version, and DESIGN <br />& CONSTRUCTION STANDARDS, most recent version, are to be used on this project. <br />B. Each Quote provider is specifically instructed to become completely familiar with the most <br />recent version of the PREVAILING SPECIFICATIONS and the DESIGN & CONSTRUCTION <br />STANDARDS prior to submitting a quote. <br />C. Wherever the PREVAILING SPECIFICATIONS refer to "State Specifications," it shall mean <br />the 2018 INDOT Standard Specifications for the letting effective after September 1, 2017. <br />D. These SPECIAL PROVISIONS will list only "Additions" or "Deletions" to the PREVAILING <br />SPECIFICATIONS and are to be used only in conjunction with the PREVAILING <br />SPECIFICATIONS. <br />E. In the event of conflict between the SPECIAL PROVISIONS and the PREVAILING <br />SPECIFICATIONS, the SPECIAL PROVISIONS will govern. <br />Ill. TERM "OR EQUAL" <br />A. Prevailing Specifications: None <br />B. Additions <br />1. Where the term "or equal" is used in these specifications, the Quote provider deviating from <br />specified item shall file with his/her Quote a letter fully explaining and justifying his/her <br />proposed article or equal. The City of South Bend shall be the sole judge in determining if <br />the "or equal" offered meets the specification. <br />IV.. TAX EXEMPT <br />A. Prevailing Specifications: None <br />B. Additions <br />1. Materials and properties purchased under contract with the Owner that becomes a <br />permanent part of the structure or facilities constructed are not subject to the Indiana Gross <br />Retail Tax (Sales Tax). The exemption number will be furnished to the Contractor upon <br />award. <br />V. INDEMNIFICATION <br />A. Prevailing Specifications: None <br />B. Additions <br />1. Contractor agrees to indemnify, defend and hold harmless the City of South Bend, its <br />agents, officers and employees, from all costs, losses, claims and suits, including court <br />costs, attorney fees, and other expenses, arising from or out of the negligent performance <br />of this Contract by Contractor, or because of arising out of any defect in the goods, <br />materials or equipment supplied by the Quote provider. <br />Version 8 — 02/25/14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.