Laserfiche WebLink
7. PROGRESS REPORTS (Cont'd <br />_Mr. Slabaugh said in front of King's Clothier <br />building, there is a six -foot vault toward the <br />street and all the way across the building. They <br />can make their cut there, and the only sidewalk <br />they would have to disturb would be to keep in <br />line with that- -six feet out from the face of the <br />building and some thirty -two feet long. Mr. Sla- <br />baugh said he put them on notice that if they would <br />have to tear that up, they should replace it; but <br />whether they can, or will, we do not know. He ad- <br />vised he is pretty sure we can get that resolved. <br />The Gas Company does have access to the vault and <br />our Mr. John Kotzenmacher has the key. <br />2) River Bend Plaza Schedule Report: RIVER BEND PLAZA <br />SCHEDULE REPORT <br />Mr. Louis N. Wilcox, Director of the River Bend <br />Plaza Office, advised he will give a brief report. <br />We have already begun meetings with the River <br />Bend Plaza. The Advisory Committee had one meet- <br />ing with the River Bend Plaza Authority relative <br />to activities in '75. He hopes to be able very <br />soon to report on some positives - -in the way <br />of people activities - -on the Plaza in '75. <br />Of some interest to the Commissioners is the fact <br />that we are taking down the Christmas decorations <br />Saturday and Sunday -- slated for storage. Messrs. <br />Farrand, Slabaugh and Wilcox are trying to work <br />out a suitable, logical storage space for the <br />Christmas decorations. Mr. Wilcox advised he <br />believes that Mr. Slabaugh may have something <br />worked out by now as he had some ideas and there <br />is some question of mechanics. <br />3) River Bend Plaza Office: RIVER BEND PLAZA <br />OFFICE <br />Mr. Wilcox also advised the Subcommittee of the <br />River Bend Advisory Committee is working on a <br />change of site, as the present site of the office <br />will no longer be in existence sometime in mid <br />June of 1975, per our present schedule. It seems <br />to be the determination of the Committee and the <br />Authority both that logically the office for <br />the River Bend Plaza activities should be on the <br />Plaza, or certainly contiguous to it, and he will <br />work along that particular line. <br />