My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Privet Lane Culvert Replacement Project Proj No 118-013B - G. E. Marshall, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Privet Lane Culvert Replacement Project Proj No 118-013B - G. E. Marshall, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 10:27:49 AM
Creation date
12/12/2019 10:17:44 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SP-42. CURB <br />A. State Specifications: Section 605 <br />B. Additions: <br />1. Proposed curbing shall be per the City Standard Details for standard curb <br />2. Payment will be made under: <br />Pay Item Pay Unit <br />Curb, Concrete LFT <br />SP-43. RIPRAP AND SLOPEWALL <br />A. State Specifications: Section 616 <br />B. Additions: <br />1. INDOT Type IA geotextile fabric shall be placed on the face of the slope before the riprap is <br />placed. <br />2. Payment will be made under: <br />Pay Item Pay Unit <br />Geotextiles for Riprap, Type 1A SYS <br />Riprap, Class 1 TON <br />SP-44. MULCH SEEDING AND SODDING <br />A. State Specifications: Section 621 <br />B. Additions: <br />1. Fertilizer and watering of permanent seeding areas shall not be measured directly but shall be <br />considered incidental to the work. <br />2. Permanent seeding shall include mulch material as required on the Plans. <br />3. Topsoil shall be placed a minimum of 4" deep and a maximum of 6" deep at all locations <br />designated on the Plans to receive permanent seeding. Topsoil shall not be compacted by heavy <br />equipment. <br />4. Topsoil shall consist of natural loam, sandy loam, silty loam, silty clay loam, or clay loam humus - <br />bearing soils adapted to the sustenance of plant life and such topsoil shall be neither excessively <br />acidic nor excessively alkaline in accordance with Standard Specification 914.01. Topsoil shall <br />be screened such that 100 percent of the topsoil passes the one 1" sieve and 90 percent passes the <br />No. 10 (2.00 min) sieve. <br />5. Topsoil obtained, from within the site limits shall not be paid for directly but shall be considered <br />incidental to the Project. Topsoil imported to the site shall be measured and paid for under the <br />topsoil Pay Item below. <br />6. Erosion Control Blanket (ECB) shall be provided at all locations of seeding shown on the Plans <br />after the topsoil has been placed to finished grade and the area has been seeded. <br />7. ECB shall be North American Green (NAG) BioNet Biodegradable S 150BN, or Engineer - <br />approved equivalent. <br />Version 7/01/2018 Special Provisions - 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.