Waiver of Lien. <br />SP-26. SITE DEWATERING <br />A. State Specifications: None <br />B. City Construction Standards & Specifications: Section 3 <br />C. Additions: <br />1. The work consists of providing labor, equipment, and materials necessary to dewater the site to <br />maintain suitable working conditions. The level of water within the work area shall be kept below <br />the active work level at all times throughout the Work. <br />2. This work shall not be measured or paid directly. <br />3. All work required for maintaining the project work site in suitable working conditions, such as <br />temporary sheeting or bypass of creek discharges, and all dewatering as necessary to complete all <br />work per the specifications shall be considered incidental to the Project, included in the cost of <br />various other Pay Items. <br />4. If adverse weather results in documented flow depths along Clyde Creek exceeding a level one <br />foot above the existing culvert invert for more than a period of three continuous days, the <br />Contractor may be eligible for a time extension under the Contract. The Contractor shall provide a <br />written request for basis of the potential request, including documentation of the dewatering <br />efforts in place; the specific days affected; the time extension sought; and a notarized statement <br />signed by an officer of the Contractor. The Engineer shall review such time extension requests <br />and forward a recommendation to the Owner. The Owner shall have the final determination as to <br />whether time extension requests due to weather are accepted under the Contract. <br />5. The Contractor shall be responsible for repairs to damages within the project construction limits <br />caused by flow along and into Clyde Creek until final acceptance of the project. <br />SP-27. MEASUREMENT OF QUANTITIES <br />A. State Specifications: Sections 109.01, 109.02 <br />B. Additions: <br />1. Earthwork is to be measured by cross -sections at the cross -sections shown on the End Area <br />Volume Report in the Plans. By submitting a Bid and subsequent execution of an Agreement, the <br />Contractor and Owner explicitly agree that the cross-section locations, associated intervals, and <br />limits of cut and fill lines form an acceptable basis for payment of all excavation quantities and <br />types. <br />2. Cut and fill quantities of earthwork are to be measured to the lines and grades shown on the Plans. <br />Embankment fill and Common Excavation shall be measured between existing (pre -construction) <br />and proposed finished grade surfaces, with full consideration of undercut required for riprap or <br />pavement subgrade project elements as shown on the cross -sections. <br />3. Undercutting for foundation or pavement base shown on the Plans is included in the Plan <br />quantities of Common Excavation and Foundation Excavation, as shown on the Plan cross - <br />sections. <br />4. Areas of required fill by materials other than soil, such as pavement, aggregate base, asphalt <br />pavement, etc. are to be excluded from embankment quantities, as shown on the Plan cross - <br />sections. <br />5. Structure backfill quantities shall be limited to the neat line slope extent shown on the Plans for <br />Version 7/01/2018 Special Provisions - 10 <br />