My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Privet Lane Culvert Replacement Project Proj No 118-013B - G. E. Marshall, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Privet Lane Culvert Replacement Project Proj No 118-013B - G. E. Marshall, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 10:27:49 AM
Creation date
12/12/2019 10:17:44 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SP-17. CONTROL OF WORK <br />A. State Specifications: Section 105 <br />B. Additions: <br />1. The complete responsibility for this project lies with the Director of Public Works of the City of <br />South Bend, Indiana acting through his authorized representatives. <br />2. All Construction Engineering and production staking shall be performed by the Contractor. The <br />Contractor shall provide all the necessary, qualified personnel, equipment and supplies to perform <br />all work required under this item. <br />3. The contractor is responsible to maintain the site which includes but is not limited to; dust control, <br />site security, erosion control, and protecting adjacent properties and utilities. <br />4. Work hours for the Project shall be from 7:00 a.m. through 6:00 p.m., Monday through Friday. No <br />work shall be permitted on weekends, Holidays, or after hours unless approved by the City of <br />South Bend Department of Public Works. <br />Payment will be made under: <br />Pay Item Pay Unit <br />Construction Engineering LS <br />SP-18. CONTROL OF MATERIAL <br />A. State Specifications: Section 106 <br />B. Additions: <br />1. Aggregates, b-borrow and asphalt materials shall be obtained from an INDOT-approved <br />manufacturer/supplier in accordance with Section 106.01. <br />2. Material records, including delivery tickets, shall be provided to the Owner's representative on the <br />date of delivery, unless otherwise allowed in writing by the Owner. <br />3. Storage of materials shall be per State Specification Section 106.05. The Contractor shall be <br />responsible for locating and securing locations for the storage of equipment and materials for the <br />work. <br />SP-19. LEGAL RELATIONS AND RESPONSIBILITY TO PUBLIC <br />A. State Specifications: Sections 107.01, 107.02, 107.08, 107.14, 107.14, 107.19, 107.20 <br />B. Additions: <br />1. The Owner, where mentioned in these documents, is the City of South Bend. The Engineer, <br />where mentioned in these documents, is McCormick Engineering, LLC. <br />2. The Contractor shall be responsible to obtain any and all required permits for the work from local, <br />state, and federal agencies and shall comply with permit requirements, including the St. Joseph <br />County / City of South Bend Building Department. <br />3. If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the <br />Contractor shall provide the Owner with proof that the Contractor is duly licensed, qualified and <br />registered with the Secretary of State of Indiana to engage in business within the State of Indiana. <br />4. The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The <br />Owner reserves the right to immediately terminate the public work project awarded should the <br />Version 7/01/2018 Special Provisions - 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.