BID TABULATION
<br />2019 Community Crossings Round 2
<br />Project No: 119-065
<br />For Bids Due: November 26, 2019
<br />Division 1:
<br />Ameritech Dr (From Cleveland Rd to 675 FT IN of Carbonmill)
<br />flemn No,
<br />005rdp6sil
<br />Ou
<br />Unt t
<br />7
<br />WnWpanca W Traffic
<br />1
<br />LS
<br />2
<br />Mobilization and Demobilization
<br />1
<br />LS
<br />T
<br />............................................................... ...... ........ . . . .........
<br />I 'Milling, Up to 1,5"
<br />.... .........
<br />6270
<br />I-
<br />SY
<br />4
<br />IHMA Surface, 9.5 mm -Type B
<br />517
<br />TONS
<br />. . ..... .
<br />5
<br />.............. . ........... . .......
<br />HMA Wedge and Leveling - Type B
<br />26
<br />TONS
<br />6
<br />HMA for Patching
<br />114
<br />TONS
<br />7
<br />Tack Coat
<br />2
<br />TONS
<br />8
<br />. ...... ....... ....
<br />Joint Adhesive, Surface
<br />. .......
<br />3435
<br />..........
<br />LF
<br />9
<br />Adjust Manhole to Grade
<br />3
<br />EA
<br />10
<br />............ .......................... . ............ . . . ..........
<br />Adjust Inlet to Grade
<br />...... .
<br />8
<br />.......... -
<br />EA
<br />11
<br />Line, Thermoplastic, Solid, White, 4"
<br />210
<br />LF
<br />12
<br />JLine, Thermoplastic, Solid, Yellow, 4"
<br />2175
<br />LF
<br />13
<br />1 Grooving for Pavement Markings, 4'
<br />2475
<br />LF
<br />14
<br />Marking, Thermoplastic, Solid, White, 24'
<br />45
<br />LF
<br />__ _LLansverse
<br />_T .. . ......... . ..............
<br />Division I Total
<br />.............. .....
<br />Engineer's
<br />Estimate
<br />Rieth-Riley
<br />Construction
<br />Walsh &
<br />Kelly, Inc.
<br />Co.,
<br />Inc.
<br />Unit Price
<br />Item Total
<br />Unit Price
<br />Item Total
<br />Unit Price
<br />Item Total
<br />$ 8,935,06
<br />$ 8,93506
<br />$ 1,50000
<br />$ 1.00.00
<br />$16,295r00
<br />1 $ 16,295,00
<br />- - - 8,935�06
<br />-
<br />8,935,06
<br />-------- -.....
<br />$ 3,001,60
<br />. ......................
<br />$ 3,001.60
<br />................
<br />$ 5,000,00
<br />$ 5,000.00
<br />$ 2,60
<br />$ 16,302,00
<br />$ 2,00
<br />$ 12,540.00
<br />$ 2,50
<br />$ 15,675,00
<br />F
<br />67.50
<br />$ 90.00
<br />$ 46,530,0
<br />$ 95,00
<br />$ 2.47000
<br />$ 10000
<br />$ 2,60000
<br />.
<br />$ 100,00
<br />...........
<br />$ 2,600,00
<br />..i ............. ;6 . .....
<br />,00
<br />..............................
<br />$ 7,980.00
<br />$ 200.00
<br />$ 22,800,00
<br />$ 100,00
<br />$ 111,400,00
<br />$ 129
<br />$ 2Z8
<br />$ 1,00
<br />$ 2,00
<br />r$ 15000
<br />$ 1.00
<br />$ 3,43500
<br />$ 0,55
<br />$ 1,869,25
<br />$ 0,05
<br />$ 171,75
<br />$ 450,00
<br />$ 1,350,00
<br />IT$mmmmm 4%00
<br />........ . .... .
<br />1.350 00
<br />...... . .
<br />$ 20000
<br />. ......... ...
<br />$ 600,00
<br />$ 25000
<br />$ 2,000-00
<br />$ 500-00
<br />$ 4.000.00
<br />$ 200.00
<br />$ 1,600,00
<br />$
<br />..........
<br />. ... ........
<br />'i 18690
<br />.... . . .....
<br />$ 0.56
<br />-
<br />$ 117,60
<br />$ 099
<br />$ 2,15325
<br />$ 0.64
<br />$ 11,392D0
<br />$ 0,56
<br />$ 1,218,00
<br />----------
<br />$ 0.99
<br />. ..........................
<br />$ 2,450.25
<br />$ 0,99
<br />$ 2,45025
<br />$ 0,35
<br />$ 866,25
<br />$ 1000
<br />$ 45000
<br />$ 14,90
<br />$ 67050
<br />$ 6,50
<br />..............
<br />$ 292Z0
<br />. . . ......... -
<br />$ 107,337.10
<br />111 94,450.00
<br />$102.666.10
<br />Engineer's Estimate
<br />Rleth-Riley
<br />Rieth-Riley Construction
<br />Walsh & Kelly, Inc.
<br />Division 2: Ironwood Dr (From Ireland Rd to 250 FT South of US 20)
<br />Co.,Co Inc.
<br />Item No. Description Queniq Unit
<br />Unit Price Item Total
<br />rc
<br />Unit P '.
<br />Unit Price Item Total
<br />Unit Price Item, Total..
<br />'
<br />1 Maintenance of Traffic 1 LS
<br />$ 18,39508 $ 18,395.08
<br />453.25 $ 13.Z325
<br />3 25
<br />$16,500,
<br />. ............... ............................... ....
<br />2 Mobilization and Demobilization 1 LS
<br />...........................
<br />$ 18.395,08 $ 18,395 08
<br />_$1
<br />_$
<br />0. '00
<br />$ 8,000,00 $ 8,000.00
<br />$ 8,300,00 $ 13,300.00
<br />3..
<br />Milling, Up to 1,5"
<br />11220
<br />SY
<br />$ 2.60
<br />$ 29,172,00
<br />$ 2
<br />$ Z00
<br />-i-
<br />22.4Z66'
<br />..
<br />T Y00'
<br />..............-
<br />$ 22,44000
<br />4
<br /> . ... . ........ .......... ... ... ... ... ...
<br />HMA Surface, 9,5 mrn - Type B
<br />926
<br />To
<br />TONS
<br />$ 9tL00
<br />$ 90,74800
<br />7
<br />$ 77.50
<br />$ 71 76500
<br />$ 88.00
<br />$ 81,48800
<br />5
<br />HMA Wedge and Leveling - Type B
<br />46
<br />TONS
<br />$ 9500
<br />$mmmmmmm 4,37000
<br />$
<br />.600.
<br />
<br />66
<br />_ 4,60.,
<br />T_00
<br />. .. ....... . .. ..... ...............
<br />6
<br />. . ............ .............. . .......
<br />HMA for Patching
<br />154
<br />TONS
<br />$ 70,00
<br />$ 10,780,00
<br />$ 100.00
<br />15,400.00
<br />$ 100.00
<br />$ 15,400,00
<br />. . .
<br />Coal
<br />.
<br />4
<br />......
<br />TONS
<br />$ 1,29
<br />................... EiT
<br />=$1
<br />4,00
<br />$ 150.00
<br />$ 60000
<br />8
<br />flT;ck
<br />Joint Adhesive, Surface
<br />6840
<br />LF
<br />$ 11�00
<br />$ 6.8 40.00
<br />$ 055
<br />.762 �00
<br />$ 0-05
<br />$ 342.00
<br />9
<br />!Adjust Inlet to Grade
<br />2
<br />EA
<br />$ 250,00
<br />$ 500,00
<br />$ 50000
<br />$ 1,000,00
<br />$ 200-00
<br />$ 400.00
<br />10
<br />. ....... ....... .
<br />Traffic Detector Loop Replacement
<br />................................... . .......... ................
<br />18
<br />EA
<br />,
<br />5, .6
<br />8,100 0
<br />$ 345,00
<br />$ 6,210,00
<br />$ 345,00
<br />$ 6.210.00
<br />11
<br />Traffic Detector Housing Replacement
<br />4
<br />EA
<br />$ 690 00
<br />$ 2,760,00
<br />$ 65000
<br />$ 2,600�00
<br />$ 650,00
<br />$ 2,600,00
<br />12
<br />Signal Cable, 2C 16 GA. Shielded
<br />290
<br />2 6Y
<br />$ 50000
<br />$ 2,00
<br />. . .
<br />$ 580.00
<br />......................
<br />$ 2,00
<br />$ 58000
<br />. ..... . ...... .
<br />13
<br />. ................... . . .................
<br />2" Conduit
<br />290
<br />LF
<br />$ 12,00
<br />$ 3,480,00
<br />$ 12.00
<br />$ 3.480,00
<br />-j-
<br />-j-
<br />j 1200
<br />T 3.48 00
<br />14
<br />Pavement Message Markings, Thermoplastic, White, Lane Indication Arrow
<br />13
<br />..
<br />EA
<br />.................. ....... . ..
<br />$ 15000
<br />.......... ....................
<br />$ 1,950.00
<br />....
<br />$ 150,00
<br />$ 1,950,00
<br />$ 100,00
<br />$ 1,30000
<br />15
<br />Line, Thermoplastic, Solid, White, 4'
<br />1115
<br />LF
<br />$ 0.99
<br />$ 1,10185
<br />$ 079
<br />$ 880,85
<br />$ 0,56
<br />...... --------
<br />$ 624.40
<br />. .
<br />16
<br />...... .... . ................ ._ . ... ........ . . . . ................................
<br />Line, Thermoplastic, Solid, Yellow, 4"
<br />.....................
<br />2410
<br />I
<br />$ 0,99
<br />$ 2,38590
<br />$ 0,54
<br />$ 1,301 40
<br />$ 0,56
<br />$ 1,34960
<br />17
<br />Line, Thermoplastic, Broken, Yellow, 4"
<br />_LF
<br />LF
<br />$ O�99
<br />$ 97020
<br />. .........
<br />$ 1,29
<br />$ 1,26420
<br />................. .
<br />$ 0.60
<br />$ 588
<br />.................
<br />. . . ....................................... ___11_.___________
<br />1L,2!,_Lh=?pIastic, Broken, White, 4"
<br />1680
<br />LF
<br />i �, 0
<br />,
<br />$ 064
<br />$ 1,075.20
<br />-j-
<br />060
<br />19
<br />___ . ....
<br />Grooving for Pavement Markings, 4'
<br />(i185
<br />LFmmm
<br />$ 0.99
<br />$ 6,123.15
<br />$ 0,46
<br />$ 2,845,10
<br />$ 0,35
<br />20 Transverse Marking, Thermoplastic, Solid, White, 24' 110 LF
<br />$ 10.00,
<br />$ 1.10000
<br />$
<br />$ 1,08900
<br />$ 650
<br />_
<br />Division 2 ... Total ................................................ . ........ .. ........ . . . . . ....... .............
<br />......
<br />$ 216,158.42
<br />--nq
<br />$163,700.00
<br />Engineer's
<br />Estimate
<br />Ftleth-Riley
<br />Construction
<br />Walsh &
<br />Kelly, Inc.
<br />Division 3:
<br />Miami St (From Ireland Rd to Widener Ln)
<br />Co.,
<br />Inc.
<br />lam oOescr!Ption
<br />Quantity
<br />Unk
<br />Unit Price
<br />Item Total
<br />Unit Price
<br />Item Total
<br />Unit Price
<br />Item Total
<br />1
<br />$ 17,94723
<br />$ 5.700 00
<br />$ 5.700 00
<br />$18,200 001
<br />$ 10,200 00
<br />2
<br />Mobilization and Demobilization
<br />1�4_1
<br />17947,23
<br />immmmm7.947,2�
<br />. ........
<br />"i 7.47&95
<br />................... ...
<br />$ 7,478.95
<br />1
<br />$ 9,400�00
<br />3
<br />Milling,1 5"
<br />n, to
<br />9350
<br />SY
<br />$ 260
<br />$ 24,31000
<br />$ 2 00
<br />$ 18,700 00
<br />4
<br />....
<br />urf 9 Type
<br />H. Type B
<br />S acs,
<br />.......
<br />-7
<br />77F
<br />6Ni
<br />9&d6
<br />i ............................
<br />75.558.00
<br />$ 77,50
<br />$ 59,752 50
<br />$ 85,00
<br />$ 65.535,00
<br />5
<br />HMA Wedge and Leveling - Type B
<br />W T �a�
<br />77
<br />TONS
<br />_�O
<br />7�3�5,6ii"
<br />'"i i'E 66"
<br />.. . . .
<br />"'i .... 7.7"0"() 00
<br />.. . ..........
<br />$ 100.00
<br />..........
<br />$ 7.700,00
<br />. . .... ......
<br />6
<br />............................................ . . ..............................................................................
<br />HMA for Patching
<br />....................
<br />130
<br />.. . ....
<br />TONS
<br />$ 70,00
<br />$ 9,100,00
<br />$ 188.00
<br />$ 24,440-00
<br />$ 100.00
<br />$ 13,00000
<br />7
<br />T c Cost
<br />Tack Coat
<br />3
<br />TONS
<br />$ 1,29
<br />S 3,87
<br />$ 1,00
<br />$ 300
<br />$ 150,00
<br />00
<br />8
<br />LJointAdhesive,Surface
<br />6260
<br />LF
<br />$ 1,00
<br />$ 6,260,00
<br />_j 0,55
<br />'$ 3,44300
<br />$ 0.05
<br />$ 313.00
<br />9
<br />................
<br />Adjust Manhole to Grade
<br />. .....
<br />9
<br />EA
<br />EA
<br />$ 450.00
<br />$ 4,050.00
<br />$ 450,00
<br />$ 4,05000
<br />$ 200,00
<br />$ 1.800,00
<br />10
<br />Adjust Water Valve Structure to Grade
<br />2
<br />$ 500.00
<br />____
<br />$ 1,00000
<br />"i '00
<br />, "' .... .......... ..
<br />$ 600.00
<br />i
<br />$
<br />......... -
<br />10000
<br />11
<br />. . ............................
<br />Adjust Inlet to Grade
<br />4
<br />EA
<br />0
<br />f$450,00
<br />$ 1 �000,00
<br />$ 500,00
<br />$ 2.000.00
<br />_� 200 00
<br />$ 80000
<br />2 ...............
<br />. .......
<br />Traffic Detector Loop Replacement
<br />2
<br />......
<br />$ 90000
<br />...........
<br />$ 345.00
<br />$ 690.00
<br />$ 345.00
<br />$ 690,00
<br />13
<br />Traffic Detector Housing Replacement
<br />2
<br />EA
<br />$ 690,00
<br />$ 1,380.00
<br />$ 6%00
<br />$ 1,30000
<br />$ 650,00
<br />............
<br />$ 1,30000
<br />14 -------
<br />...................................... . ............ ...... . ......
<br />j7- �ia
<br />, gnaC6a Shielded
<br />.................
<br />24
<br />LF
<br />$ 2.00
<br />$ 40.00
<br />$ 2,00
<br />$ 4800
<br />$ 2,00
<br />$ 48.00
<br />15
<br />2" Conduit
<br />24
<br />LF
<br />$ 12,00
<br />$ 288,00
<br />$ 1500
<br />$ 36000
<br />$ 15,00
<br />$ 360,00
<br />...........
<br />16
<br />......... ................ . ...... . ...........
<br />Pavement Message Markings, Thermoplastic, White, Lane Indication Arrow
<br />12
<br />EA
<br />$ 15000
<br />$ 1,800.00
<br />$ 150,00
<br />$ 1,800-00
<br />$ 10000
<br />$ 1,200,00
<br />17
<br />Line, Thermoplastic, Solid, White, 4"
<br />1040
<br />IT
<br />0,99
<br />1,02960
<br />Oi�'
<br />$ 821.60
<br />i
<br />582,40
<br />18
<br />................ . . ........
<br />Line, Thermoplastic, Solid, White, 6'
<br />475
<br />LF
<br />$ 125
<br />$ 593,75
<br />$ 2,25
<br />$ 1,06875
<br />06&75
<br />$ 2,75
<br />$ 1,30625
<br />19
<br />.........
<br />Line, Thermoplastic, Solid, Yellow, 4
<br />. .................................
<br />-
<br />2170
<br />�F
<br />j '99
<br />$ 2,14830
<br />$
<br />71.80
<br />$ 6 5 6
<br />$ 1,21520
<br />20
<br />Line, Thermoplastic, Broken, White, 4'
<br />1590
<br />LF
<br />$ 5,00
<br />$ 7,950.00
<br />$ 0,69
<br />$ 9,Og7,10
<br />$ 060
<br />$ 5Z66
<br />Page 1 of 2
<br />
|