Laserfiche WebLink
REGULAR MEETING NOVEMBER 26, 2019 356 <br />Maradik, seconded by Ms. O'Sullivan and carried, the recommendation to award the bid was <br />approved. <br />AWARD BIDS — SALE OF CITY -OWNED PROPERTIES — 142 N. CHICAGO & 722 <br />LAPORTE AVE. <br />Mr. Andrew Netter, Community Investment, advised the Board that on November 12, 2019, bids <br />were received and opened for the above referenced properties. After reviewing those bids, Mr. <br />Netter recommended that the Board award the contracts to Victor Lopez, I I10 Lincoln Way <br />West, South Bend, IN, 46616, in the total amount of $950 for 142 N. Chicago St., and $875 for <br />722 LaPorte Ave. for a total cost of $1825. He informed the Board that the city has agreed to <br />purchase Mr. Lopez's lot at 517 Allen St. in the amount of $925 leaving the balance Mr. Lopez <br />will pay for the properties at $900 plus advertising and closing costs. Therefore, Ms. Maradik <br />made a motion that the recommendation be accepted, and the bids be awarded as outlined above. <br />Ms. O'Sullivan seconded the motion, which carried <br />AWARD BID — MAIN AND COLFAX PARKING STRUCTURE PAINT REMOVAL <br />PROJECT NO. 119-078R (PARKING GARAGES) <br />Ms. Becca Plantz, Engineering, advised the Board that on November 19, 2019, bids were <br />received and opened for the above referenced project. After reviewing those bids, Ms. Plantz <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />T. George Podell & Co., Inc., 23146 Ireland Rd., South Bend, IN 46614, in the amount of <br />$143,700. Therefore, Ms. Maradik made a motion that the recommendation be accepted, and the <br />bid be awarded as outlined above. Ms. O'Sullivan seconded the motion, which carried <br />AWARD QUOTATION — CODE ENFORCEMENT VESTIBULE — PROJECT NO. 119-101 <br />(CODE ENFORCEMENT) <br />Mr. Adam Parsons, Central Services, advised the Board that on November 12, 2019, quotations <br />were received and opened for the above referenced project. After reviewing those quotations, <br />Mr. Parsons recommended that the Board award the contract to the lowest responsive and <br />responsible bidder, R. Yoder Construction, Inc., PO. Box 69, Nappanee, IN 46550, in the amount <br />of $23,150. Therefore, Ms. Maradik made a motion that the recommendation be accepted, and <br />the quotation be awarded as outlined above. Ms. O'Sullivan seconded the motion, which carried. <br />AWARD QUOTATION — ERSKINE WELL NO. 2 REHABILITATION — PROJECT NO 119- <br />096 (WATER WORKS OPERATIONS) <br />Ms. Becca Plantz, Engineering, advised the Board that on November 12, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Ms. <br />Plantz recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, Peerless Midwest, 55860 N. Russell Industrial Pkwy, Mishawaka, IN 46545, in the <br />amount of $64,600. Therefore, Ms. Maradik made a motion that the recommendation be <br />accepted, and the quotation be awarded as outlined above. Ms. O'Sullivan seconded the motion, <br />which carried. <br />AWARD QUOTATION — EDISON WELL NO. 3A REHABILITATION — PROJECT NO 119- <br />097 (WATER WORKS OPERATIONS) <br />Ms. Becca Plantz, Engineering, advised the Board that on November 12, 2019, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Ms. <br />Plantz recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, Peerless Midwest, 55860 N. Russell Industrial Pkwy, Mishawaka, IN 46545, in the <br />amount of $66,900. Therefore, Ms. Maradik made a motion that the recommendation be <br />accepted, and the quotation be awarded as outlined above. Ms. O'Sullivan seconded the motion, <br />which carried. <br />APPROVAL OF REQUEST TO REJECT QUOTES — NORTH PUMPING STATION FLOOD <br />DAMAGE REPAIRS — PROJECT NO. 118-302 (LIABILITY INSURANCE) <br />In a memorandum to the Board, Mr. Jacob Klosinski, Wastewater, requested permission to reject <br />all bids for the above referenced project due to exceeding the project budget. Therefore, upon a <br />motion made by Ms. Maradik, seconded by Ms. O'Sullivan and carried, the above request was <br />approved. <br />APPROVE CHANGE ORDER NO. 5 — LIBERTY TOWER EXTERIOR RENOVATIONS — <br />PROJECT NO. 118-086R (RWDA TIF) <br />