Laserfiche WebLink
REGULAR MEETING NOVEMBER 26, 2019 <br />355 <br />PREMIER 1 CONSTRUCTION, INC. <br />105 E. Jefferson Blvd., Suite 400 <br />South Bend, IN 46601 <br />Quotation was submitted by Alan Lusk <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />QUOTATION: $21,500 <br />R. YODER CONSTRUCTION, INC. <br />27453 CR 150 <br />PO Box 69 <br />Nappanee, IN 46550 <br />Quotation was submitted by Jason Yoder <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />QUOTATION: $27,110.00 <br />Upon a motion made by Ms. Maradik, seconded by Ms. O'Sullivan and carried, the above <br />quotations were referred to Central Services for review and recommendation. <br />OPENING OF PROPOSALS — OVERHEAD DOOR SERVICES CONTRACT (VARIOUS <br />DEPARTMENT BUILDING MAINTENANCE BUDGETS) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed proposals for <br />the above referenced project. Mr. Gilot stated the proposals will be reviewed and scored based <br />on a matrix system, by a team made up of City representatives. He read the name of the <br />following company submitting a proposal: <br />INDUSTRIAL DOOR OF NORTHERN INDIANA <br />3839 South Main Street <br />South Bend, IN 46614 <br />Upon a motion made by Ms. Maradik, seconded by Ms. O'Sullivan and carried, the above <br />proposal was referred to the Central Services review team for review and recommendation. <br />AWARD BID — HISTORIC LEEPER PARK IMPROVEMENTS BID PACKAGE 2 — <br />PROJECT NO. 118-01 OB (RWDA TIF) <br />Mr. Kyle Silveus, Engineering, advised the Board that on October 22, 2019, bids were received <br />and opened for the above referenced project. After reviewing those bids, Mr. Silveus <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Northern Indiana Construction Co., Inc., P.O. Box 1333, Mishawaka, IN 46546, in the amount of <br />$813,360.05 for the Base Bid only. Therefore, Ms. Maradik made a motion that the <br />recommendation be accepted, and the bid be awarded as outlined above. Ms. O'Sullivan <br />seconded the motion, which carried. <br />AWARD BID — EWING AVENUE AND FELLOWS STREET TRAFFIC SIGNAL <br />REPLACEMENT — PROJECT NO. 118-097 (LRSA) <br />Mr. Roger Nawrot, Engineering, advised the Board that on November 12, 2019, bids were <br />received and opened for the above referenced project. After reviewing those bids, Mr. Nawrot <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Martell Electric, LLC, 4601 Cleveland Rd., South Bend, IN 46628, in the amount of <br />$194,604.50. Therefore, Ms. Maradik made a motion that the recommendation be accepted, and <br />the bid be awarded as outlined above. Ms. O'Sullivan seconded the motion, which carried <br />AWARD BID — EAST BANK TRAIL STORM REPAIRS— PROJECT NO. 118-306 <br />(LIABILITY INSURANCE FUND) <br />Mr. Scott Kreeger, Engineering, advised the Board that on November 12, 2019, bids were <br />received and opened for the above referenced project. Mr. Kreeger noted there was a discrepancy <br />in the total bid amount of $192,000 on the Bid/Proposal page and the Contractor's Bid Sheet <br />amount of $211,800. Mr. Kreeger stated after checking the math and confirming with the bidder, <br />the correct bid award amount is $211,800. Therefore, Mr. Kreeger recommended that the Board <br />award the contract to the lowest responsive and responsible bidder Walsh & Kelly, Inc., 24358 <br />State Road 23, South Bend, IN 46614, in the amount of $211,800. Upon a motion made by Ms. <br />E, <br />1 <br />F <br />