Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Two -Way Conversion of Colfax Avenue —Phase II <br />Project Number: <br />For Bids Due: <br />115-053B <br />November 26, 2019 <br />Contractor Name: Rieth-Riley Construction Co., Inc. <br />BASE BID <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />63 <br />LIGHT POLE FOUNDATION <br />8 <br />EA <br />$870.00 <br />$6,960.00 <br />64 <br />NO. 4 COPPER, 1/C <br />2,125 <br />LFT <br />$2.00 <br />$4,250.00 <br />65 <br />MULTIPLE COMPRESSION FITTING, <br />16 <br />EA <br />$23.00 <br />$368.00 <br />NON -WATERPROOFED <br />66 <br />CONNECTOR KIT, UNFUSED <br />8 <br />EA <br />$22.00 <br />$176.00 <br />67 <br />CONNECTOR KIT, FUSED <br />8 <br />EA <br />$24.00 <br />$192.00 <br />68 <br />MULTIPLE COMPRESSION FITTING, <br />16 <br />EA <br />$21.00 <br />$336.00 <br />WATERPROOFED <br />69 <br />INSULATION LINK, WATERPROOFED <br />20 <br />EA <br />$20.00 <br />$400.00 <br />70 <br />INSULATION LINK, NOW <br />20 <br />EA <br />$19.00 <br />$380.00 <br />WATERPROOFED <br />71 <br />HANDHOLE <br />5 <br />EA <br />$900.00 <br />$4,500.00 <br />72 <br />PAVEMENT MESSAGE MARKING, <br />6 <br />EA <br />$275.00 <br />$1,650.00 <br />MULTI -COMPONENT, BIKE SYMBOL <br />73 <br />LINE, MULTI -COMPONENT, SOLID, <br />185 <br />LFT <br />$5.00 <br />$925.00 <br />WHITE, 4 IN. <br />74 <br />LINE, MULTI -COMPONENT, SOLID, <br />100 <br />LFT <br />$5.00 <br />$500.00 <br />YELLOW, 4 IN. <br />TRANSVERSE MARKING, MULTI- <br />$3.25 <br />$1,153.75 <br />75 <br />COMPONENT, CROSSWALK LINE, 6 <br />355 <br />LFT <br />IN. <br />76 <br />TRASH RECEPTACLE, ASSEMBLY, <br />5 <br />EA <br />$2,200.00 <br />$11,000.00 <br />SURFACE MOUNT INSTALLATION <br />77 <br />BENCH, ASSEMBLY, SURFACE <br />6 <br />EA 1$2,300.00 <br />$13,800.00 <br />MOUNT INSTALLATION <br />BASE BID TOTAL $624, 984.00 <br />Version 4/2/2019 Contractor's Bid for Public Works -10 <br />