Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Two -Way Conversion of Colfax Avenue —Phase II <br />Project Number: <br />For Bids Due: <br />Contractor Name: <br />BASE BID <br />115-053B <br />November 26, 2019 <br />Construction Co., Inc. <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit!Price <br />Total Amount <br />42 <br />PLANTER DRAIN TILE, 4" WITH <br />272 <br />LFT <br />$30.0 <br />$8,160.00 <br />STONE AND FABRIC <br />43 <br />EROSION CONTROL BLANKET, <br />g11 <br />SYS <br />$2.75 <br />$2,505.25 <br />ERONET S75 <br />44 <br />PLANTER SOIL MIX <br />120 <br />CYS <br />$55.00 <br />$6,600.00 <br />45 <br />SHREDDED HARDWOOD MULCH <br />18 <br />CYS <br />$65.00 <br />$1,170.00 <br />46 <br />ADJUST WATER VALVE TO GRADE <br />1 <br />EA <br />$530.00 <br />$530.00 <br />47 <br />PIPE, INDOT TYPE 2,12 IN, <br />82 <br />LFT <br />$70.00 <br />$5,740.00 <br />48 <br />STANDARD INLET, 24" I.D. W/ <br />1 <br />EA <br />$1,750.00 <br />$1,750.00 <br />CASTING <br />49 <br />CASTING, ADJUST TO GRADE <br />6 <br />EA <br />$635.00 <br />$3,810.00 <br />50 <br />MAINTAINING TRAFFIC <br />1 <br />LSUM <br />$6,998.00 <br />$6,998.00 <br />51 <br />TEMPORARY PAVEMENT MARKING, <br />5,200 <br />LFT <br />$0.81 <br />$4,212.00 <br />REMOVABLE, 4 IN. <br />52 <br />CONSTRUCTION SIGN, A <br />12 <br />EA <br />$161.00 <br />$1,932.00 <br />53 <br />CONSTRUCTION SIGN, B <br />17 <br />EA <br />$54.00 <br />$918.00 <br />54 <br />CONSTRUCTION SIGN, C <br />1 <br />EA <br />$169.00 <br />$169.00 <br />55 <br />BARRICADE, III-B <br />12 <br />LFT <br />$34.87 <br />$418.44 <br />56 <br />SIGN, SHEET, SHEETING TYPE IV, <br />57 <br />SFT <br />$16.00 <br />$912.00 <br />WITH LEGEND 0.080 IN. <br />57 <br />I SIGN POST, SQUARE, TYPE 2, <br />57 <br />LFT <br />$16.00 <br />$912.00 <br />UNREINFORCED ANCHOR BASE <br />58 <br />CONDUIT, PVC, 2 IN. SCHEDULE 80 <br />980 <br />LFT <br />$8.00 <br />$7,840.00 <br />59 <br />NO. 8 THWN, COPPER CONDUCTOR <br />1,432 <br />LFT <br />$1.10 <br />$1,575.20 <br />60 <br />NO. 10 THWN, COPPER CONDUCTOR <br />464 <br />LFT <br />$1.05 <br />$487.20 <br />61 <br />NO. 12 THWN, COPPER CONDUCTOR <br />973 <br />LFT <br />$1.00 <br />$973.00 <br />62 <br />LIGHT POLE ASSEMBLY AND <br />9 <br />EA <br />$5,987.00 <br />$53,883.00 <br />LUMINAIRE, STERNBERG <br />Version 4/2/2019 Contractor's Bid for Public Works - 9 <br />