My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agreement - Dylan Dr. Lighting Improvements - Jones Petrie Rafinski Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Agreement - Dylan Dr. Lighting Improvements - Jones Petrie Rafinski Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:06:30 PM
Creation date
12/2/2019 1:05:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
O N E S <br />P E T R I E <br />R A F I N S K I <br />V;1 1 r; <br />l9c,,)° fl i rl t r,i. '1 1, ""20 1 <br />City of South Bend <br />Division of Engineering <br />1316 County -City Building <br />227 West Jefferson Boulevard <br />South Bend, Indiana 46601 <br />Attention: Ms. Alicia Czarnecki, CDT, Project Engineer <br />RE: PROFESSIONAL CONSULTING SERVICES FOR DYLAN DRIVE LIGHTING <br />IMPROVEMENTS, SOUTH BEND, INDIANA <br />Dear Alicia: <br />Thank you for contacting Jones Petrie Rafinski (JPR) regarding the above referenced project. We have <br />appreciated being able to be of service to you in the past and hope to be afforded the opportunity to <br />provide you with our services for this project. <br />UNDERSTANDING OF THE ASSIGNMENT <br />The City of South Bend is looking to convert city -owned lighting fixtures on Dylan Drive and Parkland <br />Drive to LED. This project is to also include the design of additional streetlights on Chet Waggoner Court. <br />JPR is to utilize existing GIS data to develop a base plan from which to prepare the necessary <br />construction documents and specifications. The Consultant is to coordinate the work with AEP for the <br />anticipated electrical service step down conversion. New Tesco electrical service pointes are to be a part <br />of this project. <br />There are to be two different light fixtures for this project, which will include a shoe -box style light to be <br />installed on the light poles in the southern half of Dylan Street and on Parkland (14 total light fixtures), <br />and LED upgrade kits to be installed in the existing light fixtures along the northern half of Dylan Drive (22 <br />total light fixtures). New lights that match the lights along the northern portion of Dylan Drive are to be <br />used for Chet Waggoner Court. Per conversations with the City, it is understood that new wiring will be <br />required for this proposed work as the existing wiring is older and needs to be replaced. <br />It is anticipated that, based on the anticipated budget, this project will be sent out as a quote package. <br />SCOPE OF SERVICES <br />Task 1 .Base Plan Development, <br />1. JPR will utilize existing GIS data and shapefiles to prepare a base plan from which the <br />Construction Documents and Special Provisions will be prepared. <br />2. JPR will obtain accurate locations of the electrical service points and lights poles and fixtures by <br />GPS coordinated obtained by our survey crew. All data points will in imported into the base plans. <br />Task DesLqn Services: <br />200 Nibco Parkway, Suite 200 325 S. Lafayette Blvd. 108 W. Columbia Street jpr1source.com <br />Elkhart, IN 46516 South Bend, IN 46601 Fort Wayne, IN 46802 <br />574.293.7762 574.232.4388 260.422.2522 <br />
The URL can be used to link to this page
Your browser does not support the video tag.