6. NEW BUSINESS (Cont'd <br />bid opening was on September 28, 1973, at 10:00 a.m., E.S.T., <br />in the Department of Redevelopment. Only one bid was received <br />at the opening, and publicly opened, from: <br />NAME 0 CONTRACTOR BID AMOUNT <br />H. De 4ulf Mechanical Contractor, Inc. $ 66,990.00 <br />48600 xecutive Drive <br />Mishaw ka, IN 46544 <br />Seven 7) firms received bid documents, but only the above <br />firm s bmitted a bid. This is $26,075 above our engineering <br />consultant firm's estimate. <br />Mr. Kelfin J. Butler, Commission Legal Counsel, advised the Com- <br />mission has the authority to accept any bid - -the lowest and <br />best b d, or to reject any and all bids. A motion could be <br />made to reject the single bid that was submitted and then <br />authorize the staff to do everything that is necessary to rebid <br />the pr ject. <br />The Presiding Officer, Mr. Chenney, requested we meet with the <br />engineering consulting firm, Murphy Consultants, Inc., and <br />the contractor, De Wulf Mechanical Contractor, Inc., and have <br />the contractor explain what the items cover.. Then if we <br />still consider the bid too high to re- advertise, as being <br />in the plumbing industry he feels it is impossible to do <br />the wo k for the engineer's estimate. <br />Mr. Wiggins made the motion to hold the consideration of this <br />bid in abeyance, and that the engineers and the bidder get to- <br />gether with our staff and Mr. Chenney for a conference to <br />determine whether or not the engineering estimate is reasonable, <br />reasonable basis for the bidding, and that a report of this be <br />made b ck to the Commission for the next Commission meeting. <br />Motion was seconded by Rev. Williams and carried unanimously. <br />b. Change Order No. 6 to Phase II -C: Authorization was <br />reques ed to extend contract completion date fifty -six (56) <br />calendar days to November 23,,1973 due to: <br />Delay in demolition of Office Engineer's building <br />in area of Service Drive #5. <br />Delay in construction for new building adjacent to <br />Service. Drive #2 between Washington Street and Col- <br />fax Street. <br />1) Pending decision regarding construction of Service <br />Drive #2 between Jefferson Boulevard and Washington <br />Street regarding original plan for drive and revised <br />plan dated June 25, 1973. <br />CHANGE ORDER NO. 6 <br />TO PHASE II -C, R -66, <br />APPROVED <br />