6. NEW BUSINESS (Cont'd <br />In res onse to Mr. Terry Miller's question, Mr. Lennon gave <br />an exp anation on the rationale of the savings incurred be- <br />cause f the Howell Construction Company being on the site. <br />On mot on by Mr. Wiggins, seconded by Mr. Wade and unani- <br />mously carried, Change Order No. 5 to Phase II -C Contract <br />was approved for an increase in contract price of $17,251.00. <br />c Change Order No. 5 to Contract 5, Phase III: This <br />contra (t is with The Hickey Company and the Change Order is <br />for an increase in contract amount of $513.00, to construct <br />one additional pole with two 50,000 Lumen. Fixtures located <br />at station 22 +25 14'R in block plan 5 and 6 (Wayne to Jeffer- <br />son) tc increase candle power from 1 FC as specified. to 3 FC. <br />Retailers in the area have requested the additional lighting <br />and generally accepted that this additional lighting would <br />be in the best interests of all parties concerned. <br />On motion by Mr. Wiggins, seconded by Mr. Wade and unanimously <br />carrie , Change Order No. 5 to Contract 5 was approved for an <br />increa a in contract price of $513.00. <br />d. Chan a Order No. 6 to Contract 5, Phase III: This <br />contract is with he Hickey Company and the Change rder is <br />necessitated by aevisions to the LaSalle Hotel exit, for <br />redesign in front of the LaSalle Hotel. This is for their <br />traffic going east on LaSalle Street and coming around in <br />front of the Michigan Street entrance. This was requested <br />by the owners and the manager of the LaSalle Hotel prior to <br />'73. The information that was considered was different. This <br />was received too late to be placed in the bid specifications <br />and was not included in any award to the Hickey Company. This <br />has bee discussed with the Traffic Engineer, Director of <br />Public orks, and Mr. Thomae A. Oesterling, our Engineering <br />consult nt - -all concur. <br />A break own of the change order is as follows: <br />TH HICKEY COMPANY <br />Additional Paving: <br />Coping 380 @ $2.80 $ 1,064 <br />4 x 12 x 2 -1/4 <br />380 @ $1.90 722 <br />4x8x2 -1/4 <br />608 @ $1.90 1,292 <br />Benches 530 <br />Reinforcing 300 <br />(Planters only - it being <br />understood that we will re-use <br />steel already on job for-original <br />walls and re -work atjob). <br />D <br />CHANGE ORDER NO. 5 <br />TO CONTRACT 5 AP- <br />PROVED, PHASE III, <br />R -66 <br />CHANGE ORDER NO. 6 <br />TO CONTRACT 5 AP- <br />PROVED, PHASE III, <br />R -66 <br />