Laserfiche WebLink
6. fEW BUSINESS (Cont'd <br />On m tion by Mr. Wiggins, seconded by Mr. Chenney and unani- <br />mous y carried, advertising was approved for Site Improvement <br />Cont act "I ", R -57. <br />Vault Retaining Wall Contract No. 5: Authorization VAULT RETAINING WALL <br />was requested to negotiate and enter into a Vault Retaining CONTRACT NO. 5 AUTHO <br />Wall Contract No. 5, with Van Ooteghem and Sons, Inc., for IZED, R -66 <br />Parcels 3 -1, 3 -2, 9 -21 and 9 -25, in total amount of $3,363.00, <br />R -66 <br />Ther are a total of six vaults involved, each to be closed <br />off ith a 12" concrete block wall with foundation attach- <br />ment to secure the walls: <br />On me <br />mous' <br />Vaul <br />'arcel 3 -1 <br />3 -2 <br />9 -21 <br />9 -25 & 9 -21 <br />Hans- Rintzsch Luggage $ 366.00 <br />Rodin's 190.00 <br />Gallenkamp Shop 827.00 <br />Lerner Shop and Fox <br />Jewelers 1,980.00 <br />Total $ 3,363.00 <br />)tion by Mr. Chenney, seconded by Rev. Williams and unani- <br />ly carried, authorization to negotiate and enter into a <br />t Retaining Wall Contract No. 5 was approved, in total <br />it of $3,363.00, with Van Ooteghem and Sons, Inc. <br />Change Order No. 2 to Water Force Account Phase II -B: CHANGE ORDER NO. 2 <br />Auth )rization was requested for this Change Order for addi- TO WATER FORCE ACCOU <br />tion 1 work on Parcels 8 -2, 8 -3 and 4 -14, for an increase in PHASE II -B APPROVED, <br />total Force Account, in amount of $1,742.00, R -66. R -66 <br />Mr. Slabaugh said the construction of the 84" storm sewer by <br />Arco Engineering Construction Company has made it necessary <br />to r tire the water main in the Old Lincolnway East, thus in- <br />terr pting the service at Parcels 8 -2 and 8 -3, Office Engineers, <br />at a cost of $1,255.00. Also the tap and connection which feeds <br />the oiler at Vogue Beauty College will have to be connected in <br />the asement which means drilling through the walls and making <br />a co nection to Michigan Street, at a cost of $487.00, or a <br />grand total of $1,742.00. This is primarily for boiler feed <br />and at least part of this will be salvaged for the proposed <br />park'ng structures on Parcels 8 -2 and 8 -3. <br />This makes the total Force Account in effect for Phase II -B: <br />$60, 00.54. <br />On m <br />mous <br />Phas <br />)tion by Mr. Wiggins, seconded by Mr. Chenney and unani- <br />ly carried, Change Order No. 2 to Water Force Account <br />II -B, was approved, in amount of $1,742.00. <br />