Laserfiche WebLink
6. NEW BUSINESS (Cont'd <br />On m tion by Mr. Wiggins, seconded by Mr. Chenney, and unani- <br />mous y carried, the above motion was authorized. <br />c. Reuse Appraisal Contracts: Authorization was requested REUSE APPRAISAL <br />to negotiate and enter into contracts with John G. Pence Associ- CONTRACTS AUTHORIZE <br />ates Inc., in amount of $200.00 plus travelling expenses, and R -66 <br />Larr Smith & Company, Inc., in total amount of $300.00, for re- <br />use #ppraisals on Disposition Parcel No. 1 -1, R -66. <br />Mr. Wiggins made the above motion, seconded by Mr. Chenney, and <br />unan mously carried. <br />Councilman Walter T. Kopcznski was present, and the Chair made <br />the introductions. <br />Change Order No. 10 to Demolition and Site Clearance <br />Contract No. 5: This Change Order is with Woodruff Construc- <br />tion Co., Inc., for the deletion of all structures which are <br />shown on the contract as not demolished and for which a Notice <br />to P oceed was not issued, with a decrease in contract price <br />of $M10.00, R -57, and the contract is being terminated. <br />Mr. 31abaugh said last year we let Contract No. 6, which <br />picked up all the structures for demolition which were avail- <br />able in this project. Woodruff requested his 10% retention, <br />whici we sent to him. We want to cancel the rest of Contract <br />No. 5 to write off the R -57 Project. This is part of closing <br />out he Project. <br />On m tion by Mr. Wiggins, seconded by Mr. Chenney and unani- <br />mously carried, Change Order No. 10 to Demolition and Site <br />Clearance Contract No. 5 was approved, decreasing the contract <br />price in amount of $3,310.00, and terminating the contract. <br />Site Improvement Contract "I ", R -57: Permission to <br />advertise this Contract for site improvements in certain muck <br />area to bring curbs, streets and sidewalks back to original <br />grad s of construction and to restore drainage in accordance <br />with original plans and specifications was requested. This <br />is 6r clean -up work - -also to close out R -57 Project. <br />Mr. 31abaugh said we did not take out the muck to save money <br />as it was a calculated risk. The curbs and sidewalks have <br />drop )ed. We know where the muck areas are and can repave <br />these. This would be for the removal of sidewalks and curbs <br />that have sunk, removal of unstable material below these and <br />bringing the curb line and sidewalks up to grade. We were <br />resp nsible for not taking out all the muck. It is our ob- <br />ligation to bring it up to grade. The Engineer's Estimate <br />is $10,600, which includes two manholes, two inlets, quite a <br />bit Df repaving, sidewalks and curbs. <br />- 7 - <br />CHANGE ORDER NO. 10 <br />TO CONTRACT NO. 5 <br />APPROVED, R -57 <br />ADVERTISING APPROVE <br />FOR SITE IMPROVEMEN <br />CONTRACT "I", R -57 <br />