Laserfiche WebLink
7. NEW BUSINESS (Cont'd) <br />Change Order No. 4-to Contract Phase II -B, Part A CHANGE ORDER NO. 4 <br />& B R -66: This Change Order is with-Arco Engineering TO CONTRACT PHASE II -B, <br />Cons ruction-Corporation, for an increase in contract PART A & B APPROVED, <br />amou t of $13,678.00, R -66. Mr. Lennon said Clyde E: R -66 <br />Williams & Associates, Inc., consultant engineers, con - <br />curr d with the change order and they have agreed to <br />and pproved, and we recommend it be authorized. <br />The concrete retaining wall around the 78" pipe at Struc- <br />ture #62 had to be rebuilt because it was in deplorable <br />shap —both structurally and esthetically. The wall had <br />to bE tied back to a concrete deadman to prevent collapse. <br />It was also rebuilt to a point approximately three feet <br />abov the 78" pipe because the top of the wall had been <br />bad, broken down and hacked away at during years past. <br />Also unsuitable removal of approximately 2,000 cubic yards <br />from southeast corner of Michigan and LaSalle Street, Str. <br />#31 Yeplaced with new inlet because existing inlet is badly <br />cracked and existing outflow pipe is only 6 ". Structure <br />25 -A is no longer operational, to be removed and replaced <br />with a new inlet and 44' Group "L" pipe to connect with Str. <br />#26. <br />On m tion by Rev. Williams, seconded by Mr. Chenney and <br />unanimously carried, Change Order No. 4 to Contract Phase <br />II -B, Part A and B, with Arco Engineering Construction <br />Corp (ration was authorized, with an increase in contract <br />amou t of $13,678.00. <br />e. O <br />Option Agreements: Approval and authorization was O <br />OPTION AGREEMENTS <br />R -57 7 <br />Merry A <br />Ave. 1 -7 2126 W. Washington St. 7,125.00 <br />Merry A <br />Ave. 1 -11 2202 W. Washington St. 2,550.00 <br />On motion b <br />by Mr. Wiggins, seconded by Mr. Chenney and unani- <br />mously c <br />carried, the above - stated Option Agreements were ac- <br />cepted a <br />and the President authorized to execute. <br />f R <br />Rehabilitation Grants: Commission approval was re- T <br />THREE (3) GRANTS <br />quested f <br />for the following three (3) grants: A <br />APPROVED: <br />Proje t <br />t Parcel No. Address Grant Amount P <br />PARCEL 44 -23: R -57 <br />R -57 4 <br />44 -23 221 S. Kaley St. $ 25852.00 4 <br />" 24 -24 & <br />E -3 2 <br />24 -24 833 N. St. Louis Blvd. 3,500.00 <br />E -3 4 <br />40 -4 826 Sorin "St. 3,500.00 ** <br />Col <br />ination Loan and Grant. <br />- 12 - <br />