My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 07-02-71
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1970-1979
>
1971
>
RM 07-02-71
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2012 10:47:23 AM
Creation date
9/11/2012 3:26:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6. NEW BUSINESS (Cont'd) <br />Mr. A henfelter advised Michigan City prison is inter- <br />ested in some of the salvage and will contact the <br />demolition contractors. Some buildings are being <br />strip ed even with police surveillance. <br />Demolition Contract No. 16: Authorization ADVERTISING APPROVED <br />was 'r queste to a vertise for Demolition Contract' FOR DEMOLITION CONTRACT <br />No. 15 for track, ties and switches. This includes NO. 16, R -66 <br />the tack and ties on East Western Avenue in Howard <br />Park and entire brige at St. Louis Boulevard, R -66 <br />Project. The rails only are to be removed from the <br />trestle across the river, later to be a pedestrian <br />crossing. <br />Mr. H mmerschmidt advised the Grand Trunk Ra.ilroa:d <br />wants no salvage. The Park Department will want all <br />the ties and some 100 to 200 feet of rail left in <br />place in area between trestle and St.` Louis Boule- <br />vard. <br />On mo ion by Mr. Wiggins., seconded by Mr. Chenney, <br />the a vertising was authorized for Demolition Contract <br />No. 1 , and motion unanimously carried. <br />Change Order No. l to Demolition Contract No.CHANGE.ORDER NO. 1 TO <br />7 -B: This covers t deet moliti'on. and backfill of DEMOLITION CONTRACT NO. <br />vaulted sidewalk in front of Parcel No.13 -6, which .7 -B AUTHORIZED, R -66 <br />is the Dana Cook Building, located at 215 East Wayne <br />Street. The sidewalk dimensions are 20 feet by.55 <br />feet y 8 feet deep. The front wall_is to be removed. . <br />This work is necessary due,to road construction, in. <br />Phase I, and is an increase, in contract price of <br />$1,100.00, with no change in time. <br />A discussion followed on change orders.and.the re- <br />comme dation was made for the professionals and our. <br />staff to investigate and use foresight prior_to. <br />professionals supplying bids. Unforeseen exceptions <br />may occur resulting in change orders being in order <br />and n cessary, which may result in increases and /or <br />decre ses in cost. <br />On motion by Mr. Chenney, seconded by Mr.. Wiggins, <br />Change Order No. 1 to Demolition Contract No. 7 -B, <br />was authorized for an increase in contract price of <br />$1,100.00, to B & B Wrecking & Excavating, Inc. <br />Motion was unanimously carried. <br />d. Curb Cuts or Access to Property During CURB CUTS OR ACCESS TO <br />Phase I, Site Im rovements, R -'66: A.curb cut,is . PROPERTY AUTHORIZED FOR <br />requested at Inwoods Store with the street being PHASE I, R -66 <br />closed off, and also authorization for future curb <br />cuts or accesses to properties during the Phase I <br />kid <br />�i <br />v <br />�a <br />`ra <br />6�1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.