Laserfiche WebLink
ROBE R <br />WZ <br />0�1DISS <br />Containment Ike uirements: It is our understanding that the following containment measures will be taken to <br />minimize the spread of the dust and debris being removed from the application: <br />• Basic Containment — This containment includes setting up one or more temporary barriers to help minimize <br />the spread of the dust and debris being removed from the application. <br />• Engineered Containment (as necessary) — This containment includes the custom construction of a physical <br />barrier around the work area to separate it from the surrounding areas. <br />Cleanup Requirements: <br />It has been agreed that the following cleanup process will be conducted upon the completion of this job: <br />• Broom Sweeping/Shoveling — To collect abrasive media and paint chips on the floor and place them into a <br />designated disposal container/dumpster. Additional dust and material in less -accessible areas may remain. <br />• Industrial Vacuuming (as necessary) - To vacuum the floor to remove loose materials, and to place them <br />into a designated disposal container. <br />+Client shall rovide: <br />• That all nearby personnel follow safety protocol including, but not limited to, wearing safety glasses, using <br />proper hearing protection (sound can reach approximately 110 dbs.), and maintaining a safe distance from <br />the blasting area. <br />• A 120 volt power electrical outlet and adequate lighting. <br />• A designated area on -site to stage trucks, materials, and equipment. <br />• SDS sheets prior to the job onset for all relevant chemicals and products. <br />• An Authorized Person: It is essential to the success of this project that our client has one Authorized Person <br />available to meet with Polar Clean at the onset of this project, and throughout the project, to provide <br />feedback and to mutually confirm a satisfactory level of clean, which Polar Clean will use as a standard <br />throughout the project. This will allow Polar Clean to adjust or even stop the process if the results do not <br />meet or exceed expectations. The Authorized Person must have decision -making authority regarding the <br />results of the project that is supported by upper management. <br />• Once the project is completed, all work will be verified by the Authorized Person upon signing the work <br />completion form provided, prior to demobilization. If there is a need to change the Authorized Person, a <br />clear hand-off authority must be followed. At this time our understanding is that this authorized person is <br />to be determined prior to project commencement. <br />Sensitive Item Identification and Protection: <br />Prior to blasting, it is the Client's responsibility to identify and protect any and all sensitive items in the blast <br />cleaning area and scope of work to prevent potential damage. Examples of this include ceramic items, sprinkler <br />heads, photoelectric eyes, pneumatic and hydraulic lines, electric wires, sensitive wall insulation, and other <br />types of sensors. <br />Resources Anticipated: <br />• Mobilization and Demobilization of Equipment and Personnel <br />• Air Compressor — 400/200 High Pressure, Aftercooler and Air Dryer <br />• Compressor Delivery and Return <br />• Wet Abrasive Blast Cleaning Equipment Packages <br />o High Pressure Blasting Unit <br />o Customized Nozzle Set <br />