Laserfiche WebLink
�,,s earth 1900 <br />n*te 1 200 <br />Figure 2: Aerial imagery showing developed artificial bar downstream of the Leland Avenue CSO <br />Project Technical Approach <br />1. Identification of Project Boundaries <br />Cardno, in consultation with the City of South Bend and the permitting agencies will determine the limits <br />of proposed construction at each of the three project sites. The 12 digit Hydrologic Unit Code HUC), as <br />well as Latitude and Longitude Coordinates of the project extents will be included in the final report. <br />Survey information will utilize NAD 1983 Datum and UTM (Universe Transverse Mercator) Coordinates. <br />2. Complete preliminary engineering/calculations <br />Cardno will complete the necessary engineering activities and computations for a design project. This <br />task will include additional survey work, soil borings and geotechnical analyses as required, and <br />hydrologic and hydraulic analyses. <br />3. Obtain all required project permits <br />Cardno will submit the design plans with permit applications to the USACE, IDEM, and IDNR, to obtain <br />the respective Clean Water Act 404 and 401 authorizations, and floodway permits for the combined <br />projects or individually as independent projects. While Cardno has successfully obtained permits for <br />hundreds of water resource impacts over the years, we cannot warranty that we will be successful at <br />obtaining all required permits for all three projects designed. Cardno will attend meetings to continue <br />discussions with the agencies or make requested changes to the plans until the permits are issued or <br />denied. The LARE staff and City Engineers office will be invited to attend all meetings with the <br />agencies. <br />