My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to PSA - Engineering Design Services for St. Joseph Riverbank Stabilization - Cardno, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Amendment to PSA - Engineering Design Services for St. Joseph Riverbank Stabilization - Cardno, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:24:31 PM
Creation date
11/14/2019 10:18:27 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�,,s earth 1900 <br />n*te 1 200 <br />Figure 2: Aerial imagery showing developed artificial bar downstream of the Leland Avenue CSO <br />Project Technical Approach <br />1. Identification of Project Boundaries <br />Cardno, in consultation with the City of South Bend and the permitting agencies will determine the limits <br />of proposed construction at each of the three project sites. The 12 digit Hydrologic Unit Code HUC), as <br />well as Latitude and Longitude Coordinates of the project extents will be included in the final report. <br />Survey information will utilize NAD 1983 Datum and UTM (Universe Transverse Mercator) Coordinates. <br />2. Complete preliminary engineering/calculations <br />Cardno will complete the necessary engineering activities and computations for a design project. This <br />task will include additional survey work, soil borings and geotechnical analyses as required, and <br />hydrologic and hydraulic analyses. <br />3. Obtain all required project permits <br />Cardno will submit the design plans with permit applications to the USACE, IDEM, and IDNR, to obtain <br />the respective Clean Water Act 404 and 401 authorizations, and floodway permits for the combined <br />projects or individually as independent projects. While Cardno has successfully obtained permits for <br />hundreds of water resource impacts over the years, we cannot warranty that we will be successful at <br />obtaining all required permits for all three projects designed. Cardno will attend meetings to continue <br />discussions with the agencies or make requested changes to the plans until the permits are issued or <br />denied. The LARE staff and City Engineers office will be invited to attend all meetings with the <br />agencies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.