My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 3 to PSA - Architechtural Design & Construction Services for Tech Resource Center - Epoch Archetecture + Planning
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Amendment No. 3 to PSA - Architechtural Design & Construction Services for Tech Resource Center - Epoch Archetecture + Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:21:45 PM
Creation date
11/14/2019 10:16:01 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARCHITECTURE + PLANNING <br />PROPOSAL <br />October 29, 2019 <br />City of South Bend <br />227 West Jefferson Blvd. <br />South Bend, IN 46601 <br />Re: Technology Resource Center Suites 140 & 160 <br />Dear City of South Bend, <br />On behalf of EPOCH, I would like to thank you for giving us the opportunity to present to you this proposal for <br />professional services regarding a tenant build out for the City of South Bend at the new Technology Resource <br />Center at Catalyst 2. <br />We understand your goals and will act on your behalf to ensure the project is delivered with that single <br />focus. Being good stewards of your resources, we will continue to balance our time required with the <br />results you expect with this project. <br />PROJECT SCOPE <br />We understand that you would like Epoch to provide design services to facilitate all phases of design for a <br />tenant build out for the South Bend Code School at the Technology Resource Center Suites 140 and 160. <br />These phases will include Design Development, Construction Documents, Bidding, and Construction <br />Administration. To produce a finished and completed design Epoch will work with Great Lakes <br />Capital/Bradley Company, City of South Bend, and all other necessary consultants and specialists to provide a <br />set of construction documents that can be submitted for permitting reasons and can be bid. It is our <br />understanding the proposed build -out will not be required to go through the City's Public Bid process. <br />EPOCH's scope of work will include architectural, mechanical, electrical, and plumbing drawings for TRC <br />Suites 140 and 160 based on the City's program which was defined to us as an open office concept with an <br />exposed structural ceiling w/ suspended LED light fixtures. <br />It is our understanding, based on our work on the Technology Resource Center, the electrical service and <br />existing rooftop equipment servicing the existing suite(s) is adequate for the build -out. We will verify <br />conditioning capacity of the existing rooftop units based on the new occupancy use of the space. We <br />understand that new ductwork from the existing rooftop HVAC equipment will need to be included, however, <br />replacement of main building systems, and additional mechanical and electrical equipment design is excluded <br />from the scope as additional services. <br />300 W Jefferson Blvd., Suite 200, South Bend, IN 46601, P: 574-307-9990 <br />
The URL can be used to link to this page
Your browser does not support the video tag.