My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 for PSA - Prepare Bid Documents for East Bank Trail Slope Stabilization Design Services - Lawson-Fisher
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Amendment No 2 for PSA - Prepare Bid Documents for East Bank Trail Slope Stabilization Design Services - Lawson-Fisher
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:19:43 PM
Creation date
11/14/2019 10:15:04 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Provide bid period services for answering questions and preparing any necessary addendums. <br />All questions and answers shall be through city staff through said period. <br />Attend a pre -bid meeting as may be requested by the City. <br />• Attend the pre -construction meeting with the City and successful contractor. <br />« Provide construction phase services as may be required. <br />Bid packages shall be available to the City in a timeframe requested. <br />Under Article 2 Section C2.01B Compensation ADD the following to the original agreement: <br />4. A Lump Sum (LSUM) amount of $ 2,800 for preliminary design documents, final plan submission, bidding <br />documents, attending a pre -bid meeting, and other bid period services as described in the modification <br />to the scope of services above. <br />5. Construction Phase Services as described above will be paid HNTE as provided in previously executed <br />agreements. <br />Agreement Summary: <br />Original agreement amount: $ 90,740.00 <br />Net change for prior amendments: $ 13,700.00 <br />This amendment amount: $ 2,800M <br />Adjusted Agreement amount: $ 107,240.00 <br />Change in time for services (days or date, as applicable): 180 days <br />Exhibit K — Amendment to Owner -Engineer Agreement. <br />E1CDC® E-500, Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.