My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Design Services for the East Race Sewer Analysis - Christopher B. Burke Engineering, LLC.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Amendment No 1 to PSA - Design Services for the East Race Sewer Analysis - Christopher B. Burke Engineering, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:18:19 PM
Creation date
11/14/2019 10:12:06 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c) Compile a certified bid tabulation sheet and assist City staff in analyzing the <br />bids provided for an award recommendation. <br />5) Task 5 - Construction Engineering Services: CBBEL will provide "As -Needed" <br />Construction Engineering Services that include: <br />a) Attend the pre -construction meeting, review project submittals, and respond to <br />design questions that come up during construction. <br />b. The Scope of Services currently authorized to be performed by Engineer in accordance <br />with the Agreement and previous amendments, if any, is modified as follows: N/A <br />c. The responsibilities of Owner are modified as follows: <br />d. For the Additional Services or the modifications to services set forth above, Owner shall <br />pay Engineer the following additional or modified compensation: <br />1) Task 1: $$13,40 <br />2) Tasks 2 through 4: J,20,000 <br />3) Task 5: $5�,0 0 <br />e. The schedule for rendering services is modified as follows: <br />+ Revised Report — four (4) weeks from receipt of updated data from City <br />• Final Bid Documents — eight (8) weeks after approval of final report <br />(dependent on City review process) <br />f. Other portions of the Agreement (including previous amendments, if any) are <br />modified as follows: <br />5. Agreement Summary (Reference only) <br />a. Original Agreement amount: $ 25 000.00 <br />b. Net change for prior amendments: $ 0.00 <br />c. This amendment amount: $ 48 400.00 <br />d. Adjusted Agreement amount: $ 73,400.00 <br />The foregoing Agreement Summary is for reference only and does not alter the terms of the Agreement, <br />including those set forth in Exhibit C. <br />Page 2 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.